By invitation. Thursday and Friday, 2027.

Data Center Facility Leaders Summit

Two days with peers who keep data centers powered, cooled and running, and only the vendors you choose to meet.

  • ColumbusApril 29–30168 days to go
  • DetroitOctober 28–29350 days to go

Ten past delegates, in their own words · 1:47

  • 35summits since 2007
  • 29data center and critical facility leaders have come
  • 7past summits had data center leaders in the room
  • 2days. Home Friday afternoon.

Data center leaders have stood at the front of this room.

Data center operators, and the companies that work with them, presented their own projects at FMA’s Progressive Data Center Summit, and data center leaders came to hear their peers. Past speakers and delegates, not the 2027 program.

Data center speakers at past FMA summits

  • Cummins Power GenerationBrent NessData Center Segment LeaderCummins Power Generation“Backup Power Systems from Cummins Help Digital Realty Convert Old into New”
  • Digital RealtyChuck GrosbierDirector, Technical OperationsDigital Realty“Backup Power Systems from Cummins Help Digital Realty Convert Old into New”
  • PTS ConsultingSteve BarnesPrincipal Consultant, Data Center Practice ManagerPTS Consulting“Beyond MEP: Selecting the Right Data Center - A Case Study”
  • Future FacilitiesSherman IkemotoGeneral ManagerFuture Facilities“Can You Afford Lost Data Center Capacity?”
  • Primary Integration SolutionsJames McEnteggartVice-President - OperationsPrimary Integration Solutions“Mitigating Human-Error Risks Intrinsic to Data Center Operations”
  • Schneider ElectricLisa ZembrodtManager of Global Research & AnalyticsSchneider Electric“Five Global Energy Trends Shaping Energy Prices”
  • Solution DynamicsCalvin WohlertPrincipalSolution Dynamics“Optimizing the Assets You Already Have - Your Best Return on Investment”
  • SmardtPaul K Mattingly, PEDirector, ApplicationsSmardt“Cooling Plant Technologies to Achieve Greater Reliability and Reduce Energy Usage”
  • NortecDuncan CurdGeneral Manager, V.P. Sales America'sNortec“Humidification and Evaporative Cooling: Scalable Solutions to Improve PUE and Operational Reliability”
  • SunGard Availability ServicesNick MagliatoCOOSunGard Availability Services“Avoiding the Cost of Downtime- How Colocation Can Help Your Organization Achieve High Availability”
  • ERS InternationalJeffrey MendezGlobal Communications DirectorERS International“Life Beyond Landfill”
  • xByte TechnologiesStephen JaynesCOOxByte Technologies“Need IT fast? Need IT now? You need xByte.”
  • Advanced Power TechnologiesDevin GrandisCEO & PresidentAdvanced Power Technologies“An Informative Look at Lighting Options, UV Applications and Creative Funding Opportunities”
  • Mitsubishi Electric Power ProductsJim HughesNational Sales ManagerMitsubishi Electric Power Products“Total System Effectiveness”
  • SealcoPeter MatteDivision ManagerSealco“Decreasing Operational Expenditures While Increasing Reliability”
  • SealcoRick TinucciProject ExecutiveSealco“Decreasing Operational Expenditures While Increasing Reliability”
  • Optimum PathDaniel TautgesPresident & CEOOptimum Path“What's Next in Software and Services to Help Manage Cloud Operations?”
  • HergoEli HertzCEO & PresidentHergo“Get Hergonized - See the Hergo Difference”
  • SavvisJoel StoneVP, Global Data CentersSavvis“The Greening Of Our Chicago Data Center”
  • SavvisDrew LeonardVP Colocation Product ManagementSavvis“The Greening Of Our Chicago Data Center”
  • ORR Protection SystemsPaul NelsonVP Sales & MarketingORR Protection Systems“New Fire Code Changes for Hot/Cold Aisle Containment... It's Significant!”
  • 10/35 Economic Development AllianceHolly CovingtonMarketing and Research Director10/35 Economic Development Alliance“The Benefits of Doing Business in Central Texas”
  • University of ChicagoRaymond ParpartSenior Consultant, Data Center OperationsUniversity of Chicago“Energy Efficiency Competes With Escalating Compute Demands in the Academic Environment”
  • Universal Air Filter CompanyDan KruppDirector - Sales & EngineeringUniversal Air Filter Company“Air Filter Solutions for Data Centers”

Data center leaders who came as delegates

29 data center and critical facility leaders from 15 organizations. Their titles, as they registered.

  • SavvisSavvis
    • VP, Global Data Center Operations
    • Facilities Manager
    • Data Center Manager
    • Lead Mechanical Engineer
    • Regional Mechanical Engineer
    • Lead Electrical Engineer
  • RackspaceRackspace
    • Data Center Director
    • Facility Design Engineer
    • Director Sustainability
    • Sustainability Manager
    • Project Engineer
  • Discover Financial ServicesDiscover Financial Services
    • Senior Data Center Manager
    • Director- Data Center Management & End Use Support
    • Data Center Manager
  • EquinixEquinix
    • Engineering Staff Director
    • Senior Manager, Facility Operations
  • SunGard Availability ServicesSunGard Availability Services
    • Chief Operations Officer
    • VP Technical Service Delivery Midwest
  • CareFirstCareFirst
    • Director, Enterprise Data Center Services
    • Manager - Data Center Services
  • Argonne National LaboratoryArgonne National Laboratory
    • Data Center Facility Manager
  • CoreSiteCoreSite
    • building manager
  • Cushman & WakefieldCushman & Wakefield
    • Director of Critical Systems and Project Management
  • Digital RealtyDigital Realty
    • Director, Technical Operations
  • Froedtert HealthFroedtert Health
    • Data Center Lead
  • JM Family EnterprisesJM Family Enterprises
    • Data Center Facilities Manager
See all 15 organizationsShow fewer
  • OfficeMaxOfficeMax
    • Data Center Facilities
  • University of ChicagoUniversity of Chicago
    • Director Data Center Operation
  • Server Farm RealtyServer Farm Realty
    • VP Critical Infrastructure

Built around the problems you’re working on.

What data center leaders are up against this year and next, with the numbers behind it. Every talk on the program answers one.

Getting power4+years

to get a grid connection in primary data center markets.

Deliverable power, on site and on the grid.

JLL, 2026
Paying for it85%minimum

AEP Ohio makes new data centers over 25 MW pay for at least 85% of the capacity they sign up for, for up to 12 years.

Stop paying for megawatts you can't use.

AEP Ohio / PUCO, 2025
Outages57%of respondents

said their last major outage came to more than $100,000; one in five said more than $1 million.

Rehearse the failure before you live it.

Uptime Institute, 2026
Building it$10.7Mper MW

to build, on average worldwide, in 2025.

Ready for service, and ready to operate.

JLL, 2026
The power bill$333.44per MW-day

PJM's capacity price hits its cap from June 2027. Ohio, western Pennsylvania and West Virginia budgets feel it first.

Procurement, peak demand and the contract.

PJM
Something else?Your project

Fixed a problem that isn’t on this list? Propose it for the program.

Propose a talk

Data center leaders come to hear how other sites fixed it.

The program is built from projects data centers actually finished, presented by the leader who ran them. Every session below is open. If you’ve solved a problem like these, your story belongs here.

  • PowerYou need power in 2027. The grid has other plans.Speaker wanted

    Grid connections take over four years in primary markets (JLL, 2026).

    The problem: New capacity is waiting on the utility, and on-site generation, storage and phased energization all have trade-offs.

    We’re looking for: A data center that got deliverable power sooner, and what it took.

    Propose this talk

  • OutagesThe $1 million outage: rehearse the failure before you live itSpeaker wanted

    57% of respondents said their last major outage came to more than $100,000; one in five more than $1 million (Uptime Institute, 2026).

    The problem: Transfers, generators and switching procedures fail when they haven't been tested under load.

    We’re looking for: A team that ran a real failure drill, found the weak link and fixed it.

    Propose this talk

  • DensityFrom 10 kW to 100 kW: retrofit the hall or start again?Speaker wanted

    High-density racks are outgrowing the cooling most halls were built with.

    The problem: Air cooling, floor loading and power distribution limit how far an existing hall can go.

    We’re looking for: A site that retrofitted a hall for higher density, or decided not to, and why.

    Propose this talk

  • Stranded capacityStop paying for megawatts you can't useSpeaker wanted

    AEP Ohio makes new data centers over 25 MW pay for at least 85% of the capacity they sign up for, for up to 12 years.

    The problem: Contracted capacity and the load you actually run drift apart, and the bill follows the contract.

    We’re looking for: A data center that matched its contract to its real load, or put stranded capacity back to work.

    Propose this talk

  • CommissioningReady for service is not ready to operate: commissioning, staffing and handoverSpeaker wanted

    Building a data center took $10.7M per MW on average worldwide in 2025 (JLL).

    The problem: Halls open on schedule with systems not fully tested, procedures not written and staff who haven't trained on them.

    We’re looking for: A build or retrofit handed over ready to run, and what the team would do again.

    Propose this talk

  • PeopleEvery shift covered: switching skills and the people who have themSpeaker wanted

    A facility-management vacancy takes 17 weeks to fill on average (IFMA, 2026).

    The problem: Qualified technicians are hard to hire, and switching skills fade when they aren't practiced.

    We’re looking for: A team that built a training pipeline or kept its switching skills current across every shift.

    Propose this talk

  • Controls securitySecuring the facility side: power and cooling controlsSpeaker wanted

    The power and cooling controls now sit on networks too.

    The problem: Vendors and contractors reach the controls remotely, often without anyone tracking it.

    We’re looking for: A team that inventoried and locked down access to its power and cooling controls.

    Propose this talk

  • Open slotYour project goes here.Propose it

People like you came before.

Past delegates are not 2027 attendees. They show who you’d be in the room with.

  • 29data center leaders from 15 organizations
  • 2energy and sustainability leaders
  • 10facilities and physical-plant leaders
See the organizations that came, and the ones that came back

They came back.

  • Rackspace4 summits, 5 people
  • Equinix2 summits, 2 people

Colocation, hosting and cloud

Savvis, Rackspace, Equinix, SunGard Availability Services, CoreSite, Digital Realty, Server Farm Realty

Enterprise data centers

Discover Financial Services, CareFirst, Argonne National Laboratory, Cushman & Wakefield, Froedtert Health, JM Family Enterprises, OfficeMax, University of Chicago

The people at your table.

Operations, critical facilities, engineering and energy leaders from enterprise, colocation and hyperscale data centers: people working on the same problems you are. Breakfast, lunch and dinner are assigned seating, so you meet them.

Pick a seatto see who sits there.

We’re inviting colocation providers, hyperscale campuses, enterprise data centers, bank and insurance data centers, telecom and network sites and hospital and university data centers.

Your seat

Thursday and Friday. Home Friday afternoon.

Same two days in Columbus and Detroit: 20-minute talks by peers, the meetings you picked, and meals at a table of people like you. Not a trade show.

Thursday

  1. Breakfast at assigned tables
  2. 20-minute talks by facility leaders
  3. Coffee and shop talk
  4. 20-minute talks by facility leaders
  5. Lunch at assigned tables
  6. 20-minute talks by facility leaders
  7. The meetings you picked, 20 minutes each
  8. Coffee and shop talk
  9. 20-minute talks by facility leaders
  10. Reception, then dinner at assigned tables

Friday

  1. Breakfast at assigned tables
  2. 20-minute talks by facility leaders
  3. The meetings you picked, 20 minutes each
  4. 20-minute talks by facility leaders
  5. Closing lunch
  6. Last talks, then head home
A speaker at the podium in front of a full ballroom at a past FMA summit
20-minute talks to a full room
Delegates at numbered round tables over lunch at a past FMA summit
Numbered tables, assigned seats
Two people shaking hands at a past FMA summit
The meetings you picked
Dinner on a terrace at a past FMA summit
Dinner on Thursday
Columbus, OhioApril 29–30, 2027Hilton Columbus Downtown
Detroit, MichiganOctober 28–29, 2027Detroit Marriott at the Renaissance Center

Photos are real FMA Summit rooms. No stock photography.

Your total investment.

Each seat covers the whole summit: full access to both days, every talk, your meetings and all meals. The more people you bring from your company or data center, the lower the rate for each added seat. A seat is one person at one summit, and seats are interchangeable: use them in Columbus, in Detroit, or both.

  • Your first 2 seats$2,900each
  • Seats 3 to 5$1,850each
  • Every seat after that$950each

A team of three is $7,650. A team of six is $12,300.

Register your teamPick how many people are coming and see your total.

Complimentary for speakers.Present a 20-minute talk and your seats are complimentary, as our thank you for speaking: up to 6 people from your company.Propose a talk

And only the vendors you pick.

FMA brings in a short list of vendors from a range of industries to help with these problems. You choose which ones you meet.

  1. Tell us what you’re working on.Before the summit, in a few lines.
  2. Choose who you want to meet.Both sides accept, or the meeting doesn’t happen.
  3. Get your schedule before you arrive.20 minutes each, at a set time on Thursday or Friday.
Getting deliverable power
Data center power and infrastructure, microgrids, electrical, energy procurement, construction
Expensive outages
Backup power, electrical, data center power and infrastructure
High-density cooling
Data center cooling, HVAC
The power bill and stranded capacity
Energy procurement, energy optimization, building automation
Builds and retrofits ready to run
Construction, data center power and infrastructure, data center cooling
Staffing every shift
Facilities outsourcing, operations software
Water, carbon and efficiency
Data center cooling, solar, energy procurement, microgrids
Controls security
Building-systems cybersecurity

Your questions, answered by delegates.

Past FMA delegates on camera, in their own words: facility leaders from universities and from other industries. Each one is under a minute.

Will vendors pitch me?

Brendan Sullivan, Estée Lauder · Stan Nolan, University of Connecticut · Mathew Emden, Principia College 0:38

Who will I meet?

David Muzzy, Texas Christian University · Al Hildreth, General Motors · Kevin Butt, Toyota · Brendan Sullivan, Estée Lauder 0:42

Is it worth two days away?

Jamie Meyers, Walgreens · Steve Driver, Sanofi · Stan Nolan, University of Connecticut 0:43

Will I find vendors who can help with my targets?

Chauncey Jenkins, University of Maryland · Jamie Meyers, Walgreens · Steve Driver, Sanofi 0:38

What are the talks like?

David Muzzy, Texas Christian University · Mathew Emden, Principia College · Jamie Meyers, Walgreens 0:32

What will I take home?

Brendan Sullivan, Estée Lauder · Scott Bohnhoff, FBI · Mathew Emden, Principia College 0:49

Register your team.

Choose your summit and how many people are coming, and your total investment shows right away. Then fill in the participation agreement, sign it and make your investment by card. Seats are interchangeable: use them in Columbus, in Detroit, or both.

Which summit?
How are you registering?
How many people?
1
1 seat. A seat is one person at one summit. Bring as many people as you like.
Your total investment$2,9001 seat at $2,900
One page: who is coming, the terms and your signature. Opens right here.
FMA SummitsSummit Participation Agreement

Data Center Facility Leaders Summit · Columbus, April 29–30, 2027 · Detroit, October 28–29, 2027

Main attendee

How many facilities do you oversee?

Additional attendees

Names not decided yet? Leave a name as “To be determined” and send it to us later.

Would you like to present at the summit? Speakers’ seats are complimentary, as our thank you for speaking, for up to 6 people from their company. Not on the program yet? Propose a talk.
Terms and conditions

Participation includes: Full access to both days of each summit a seat is used for: every talk, the meetings you book, all event meals, breaks and the evening reception. A seat is one person at one summit, and seats may be used in Columbus or in Detroit. Hotel and travel are not included.

Insurance and event security: FMA accepts no responsibility with respect to theft or damage, however caused. Carrying adequate property and casualty, professional liability, and any and all other applicable insurance policies is the sole responsibility of the Client.

Payment terms: The signatory authorizes FMA to charge the amount shown on this agreement by card through Stripe, as well as any additional amounts which may become due to FMA pursuant to this agreement. The signatory recognizes this Delegate Participation agreement as valid, binding and enforceable and renounces any defense, dispute or chargeback request with regard to charges made pursuant to it. Due to limited summit space, FMA advises early registration and reserves the right to refuse admission if payment is not received on time.

Substitution, non-attendance and cancellation: A delegate may be replaced by a colleague at any time by email. A non-attendance fee of $495 will be applied to each delegate, including speakers and guests, if FMA is not informed by email of cancellation two weeks prior to the event.

Electronic signature: The signatory agrees that the signature drawn or typed on this agreement is an electronic signature with the same effect as a handwritten one, and confirms being authorized to sign for the organization named.

Signature

Sign in the box with your mouse or your finger, or choose Type.

On behalf of your organization

FMA Summits · fmasummits.com · info@fmasummits.com

Have a project worth sharing? Tell it to your peers.

20 minutes, the real numbers and what didn’t work, in front of facility leaders working on the same problems. Bring the company that did the work, if you like. Proposing commits you to nothing.

Complimentary for speakers. Present a 20-minute talk and your seats are complimentary, as our thank you for speaking: up to 6 people from your company.

A speaker beside the FMA lectern at a past FMA summit

What every talk covers

  1. The problemWhat was happening at the site.
  2. What was at stakeUptime, power, cooling, energy or the build schedule.
  3. The decisionThe options you weighed, and why this one.
  4. The workWhat changed, how long it took, what went wrong.
  5. The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
  6. The lessonsWhat another data center should check first.
Propose a talk

Led a project you’re proud of?

Tell us about one project you finished. If it fits the program, Joe will send you a proposed session outline.

Questions delegates ask.

How do I pick the vendors I meet?
Before the summit, you tell us the problems you’re working on and choose the companies you want to meet. We match you, both sides accept, and each meeting is booked before you arrive.
How long is it?
Thursday and Friday. Friday ends with lunch, and you’re on the road by mid-afternoon.
What is the investment?
Your first two seats are $2,900 each, seats three to five are $1,850 each, and every seat after that is $950. A team of three is $7,650; a team of six is $12,300. Each seat covers full access to both days and all meals. A seat is one person at one summit, and seats can be used in Columbus, in Detroit, or split between them. Speakers’ seats are complimentary, as our thank you for speaking, for up to 6 people from their company.
How do I speak?
Propose a 20-minute talk about a project you led, with the form on this page. Bring the company that did the work if you like. Every proposal goes to Joe Piazza, who builds the program.
Who runs it?
FMA Summits, founded by Joe Piazza in 2007. He has run every summit himself: 35 of them, 17,000+ meetings.

Your data center fixed something. Tell the room how.

Propose a 20-minute talk, or register your team. Reply to the email that brought you here, or write to Joe Piazza at info@fmasummits.com.

35 summits since 2007. The films and quotes on this page are from past summits.

Connecting the right people.

The data center with the problem and the company with the answer, at the same table.

FMA Summits, by the Facility Management Alliance Testimonials are past FMA sponsor and delegate feedback. Statistics cite the sources shown.
Propose a talk

Brendan Sullivan, David Muzzy, Al Hildreth, Stan Nolan, Steve Driver, Jamie Meyers, Mathew Emden, Chauncey Jenkins, Scott Bohnhoff and Kevin Butt, past FMA delegates, recorded at past FMA summits.

Hotel websiteOpen in Maps

Open in a new tab
FMA Summits 2027 · Columbus & Detroit

Book a 20-minute call with Joe

Pick a time. Joe calls you at the number you enter: the audience, the package and the dates.

Prefer email? info@fmasummits.com