Executive Summits · by the Facility Management Alliance
Hospital & Data Center Backup Power Summit
Meet the hospital and data center leaders whose backup power has to work the first time.
Each summit is capped at 20 sponsors. Talk to Joe before it fills.
Who’s coming so far
24 organizations have confirmed they will send facility leaders: 6 hospitals, 8 universities and 10 commercial buildings.
- Cleveland Clinic
- Ohio State University Wexner Medical Center
- Cleveland Clinic Fairview Hospital
- The Christ Hospital
- Cleveland Clinic Hillcrest Hospital
- OhioHealth Riverside Methodist Hospital
- Ohio State University
- University of Michigan
- University of Cincinnati
- University of Kentucky
- University of Pittsburgh
- Kent State University
- Ohio University
- Wayne State University
- Key Tower
- Terminal Tower
- Great American Tower at Queen City Square
- 200 Public Square
- Sherwin-Williams Headquarters
- Carew Tower
- LeVeque Tower
- Huntington Center
- One Nationwide Plaza
- AEP Building
Two days with facility directors, directors of plant operations, chief engineers and data center facilities leaders from Midwest hospitals and data centers who own the emergency power system: aging generators, UPS and transfer switch failures, longer outages and code-required testing. Pre-scheduled 1-on-1 meetings. No expo hall.
The people who sign the PO for backup power projects.
Invited from facilities across Ohio, Michigan, Indiana, Pennsylvania and Kentucky. Every delegate is screened by title and facility.
Titles
- Director of Plant Operations Generators, transfer switches, monthly tests
- VP of Facilities Signs the replacement project
- Data Center Facilities Director UPS, switchgear and uptime
- Chief Engineer Runs the emergency power system
- Critical Environments Manager Load banks, fuel and maintenance
Industries we're inviting
- Hospitals and health systems Code-required emergency power
- Colocation data centers Tenants who can't go dark
- Enterprise and hyperscale data centers Megawatts of standby power
- Medical office buildings and clinics Imaging, labs, refrigeration
- Research labs and campus data rooms Freezers, servers, experiments
Past FMA delegates include energy and facility leaders from Toyota, General Motors, Sanofi, The Estée Lauder Companies and Walgreens.
Who came before.
The organizations and titles that came to past FMA summits, and the facility leaders who spoke. Past delegates are not 2027 attendees; they show who this audience is.
Who decides on backup power projects
Run the buildings
Director of Facilities
Facilities Manager
Facility Manager
Own energy costs
Energy Manager
Energy Engineer
Energy Program Manager
Write the spec
Electrical Engineer
Mechanical Engineer
Director of Engineering
Lead sustainability
Director of Sustainability
Sustainability Manager
Sustainability Coordinator
Build and renovate
Project Manager
Architect of the Capitol
Architectural Draftsman
Past facility delegates in each role, with the most common titles. Each person is counted once, in the first role their title fits; the other 194 of the 721 hold other titles.
Past speakers and delegates, by type of facility
Universities, colleges and schools
21 speakers · 188 delegates






Hospitals and health systems
9 speakers · 86 delegates





Office towers, corporate campuses and stores
16 speakers · 141 delegates






Data centers
5 speakers · 17 delegates






Cities, counties and government
35 speakers · 168 delegates






See seniority and past speakers
Seniority of past delegates: 74 C-suite, presidents & VPs · 215 directors · 248 managers · 96 engineers & specialists · 88 with other or no titles. Total 721.
See every organization and the titles it sent, by type of facility
Counts come from past FMA delegate lists, not confirmed attendance. Organization names show where past delegates and speakers worked. They are not sponsors of FMA Summits and do not endorse it.
They came back.
Past FMA sponsors, and how many summits each one sponsored, from the printed programs.
- 5PowerSecureBackup power · 5 summits
- 2GE Distributed PowerBackup power · 2 summits
- 18US LED18 summits
- 17Kaeser Compressors17 summits
- 14Covanta14 summits
- 14Solution Dynamics14 summits
- 10Advanced Power Technologies10 summits
- 8Smardt Chiller Group8 summits
- 7BASF7 summits
- 7EQUIDEX Energy7 summits
- 7LG Electronics7 summits
- 6AgriPower6 summits
See the other 102 companies that sponsored two or more FMA summits
3M 2 · Acuity Brands 4 · Advanced Green Technologies 3 · Advantix Systems 8 · AERCO International 5 · Air Balance 2 · AmbiRad 3 · Ameresco 2 · Armstrong Fluid Technology 5 · Badger Meter 2 · Be Power Tech 2 · Bio-Reaction Industries 2 · BLUEFIN 4 · Bosch Thermotechnology 2 · Burns & McDonnell Engineering 3 · Camfil 2 · Capstone Turbine 2 · Chelsea Group 2 · Cleaver-Brooks 4 · ConDex Energy 2 · Constellation Energy 5 · Control Instruments 2 · CopperTree Analytics 3 · Cushman & Wakefield 2 · Cypress Envirosystems 5 · Doosan Fuel Cell America 3 · DTE Energy Services 2 · Dyson 4 · Eaton 3 · EcoSafe Zero Waste 2 · EDF Renewable Energy 2 · Edison Energy 2 · Emerson Climate Technologies 2 · Energy Management Systems 4 · Energy Source 2 · EnerNOC 2 · Enertech Global 2 · EnterSolar 2 · Environmental Resources Management 2 · ERS International 3 · ETwater Systems 2 · Every Watt Matters 2 · Eye Lighting International 3 · Facility Solutions Group 2 · FacilityConneX 2 · Fellon-McCord & Associates 3 · GDF SUEZ Energy NA 2 · GE Solar 2 · Gexpro 3 · GI Energy 2 · Green Ballast 2 · Greenstar Recycling 6 · Greenworks Energy Solutions 3 · Harris Lighting 2 · Heritage Interactive Services 2 · Hurst Boiler & Welding Co. 2 · IBM 4 · ICETEC Energy Services 2 · ICONICS 3 · Invensys Operations Management 2 · JLL 4 · Jorgensen Facilities Services 5 · K+S Services 2 · KDC Solar 2 · KERAMIDA 2 · Knauf Insulation 2 · KVAR Energy Savings 3 · LEDtronics 2 · Lutron Electronics Co. 3 · MaxLite 2 · MCEnergy 2 · MEP Associates 2 · MPC Energy 5 · Munters 2 · Newton Distributing Company 2 · Nortec 3 · North America Power Partners 2 · North American Roofing 2 · OAKLEAF 4 · Optimum Energy 2 · Orion Energy Systems 2 · OSRAM SYLVANIA 5 · Pfister Energy 2 · Rinnai America 2 · Rockwell Automation 2 · ROXUL 2 · Rubicon Global 2 · SAP America 2 · Schneider Electric 6 · Shaw Environmental & Infrastructure 5 · Sloan 2 · Solar UV Solutions 3 · Solatube International 3 · Steril-Aire 2 · Synergy Investment 6 · The Dow Chemical Company 2 · Thermal Energy International 3 · Trane 2 · Tremco Roofing and Building Maintenance 2 · Viridity Energy 2 · Wahaso - Water Harvesting Solutions 2 · Zurn Industries 2
In writing, from past sponsors and delegates.
Their words, not ours.
“…at each FMA Summit we have gained one actual customer as a minimum”
Past sponsorMark MartyakChief Sales Officer, PowerSecureRead the whole quote
“I can tell you at each FMA Summit we have gained one actual customer as a minimum which is great. This show has been really good here in Columbus. Met 2 or 3 potential customers that I really do think we’ll end up doing business with…”
“Couldn’t recommend it higher.”
Read the whole quote
“The conversations have been great, the meetings have been good, the organized lunches, the organized happy hour and cocktail event was excellent. Couldn’t recommend it higher.”
Past sponsorTom DrakeSenior Sales Manager, MTU Onsite Energy“…we have enough time to really sit down and go through what their goals and their missions are”
Read the whole quote
“What I found different with FMA Summits versus some of the other conferences that we attend is that I’m not running around and grabbing people to talk to… we have enough time to really sit down and go through what their goals and their missions are.”
Past sponsorVictoria SanvilleSenior Manager, Enterprise Business Development, LG Electronics“…probably 4 to 5 different touch points”
Read the whole quote
“This event has been really great in that we have seen potential customers not once but there has been probably 4 to 5 different touch points in that they have been sincere and meaningful.”
Past sponsorTim MagnerSenior Sales Manager, GE SolarSee 2 moreShow fewer
“This was my first time sponsoring the FMA Summit and have to say everything about this conference from the quality of attendees to the venue was first class. The quality of conversations were really good in that FMA set us up with customers who had already expressed an interest in us. The attendees were all high level decision makers. Very impressed and will be back!”
Past sponsorMark MartyakChief Sales Officer, PowerSecure Inc.“…I too enjoyed the summit and found lots of good information to use.”
Hospitals in the room.
Past FMA delegates include facility leaders from 50 hospitals and health systems. Leaders from ten of them presented their own projects:
- AdventHealth Wesley Chapel
- Aurora Health Care
- Children's Hospital of Philadelphia
- Dana-Farber Cancer Institute
- Gundersen Lutheran
- McFarland Clinic
- NYC Health + Hospitals
- Parkland Health and Hospital System
- Peninsula Regional Medical Center
- Penn State Health Milton S. Hershey Medical Center
See the other 40Show fewer
Advocate Healthcare · Audie L. Murphy Veteran's Hospital · Banner Health · Beth Israel Deaconess Medical Center · Brooklyn Hospital Center · CentraState Healthcare System · Children's Hospital Colorado · Denver Health · Exempla St. Joseph Hospital · Froedtert Health · Hackensack University Medical Center · HealthSouth · Holy Name Medical Center · Indian Health Services · Intermountain Healthcare · Loyola University Health System · Massachusetts General Hospital · Medical College of Wisconsin · Medical University of South Carolina · Memorial Hospital South Bend · Memorial Sloan Kettering Cancer Center · Mercy Health · Methodist Hospitals · Muskogee Community Hospital · Newton Wellesley Hospital · Norton Healthcare · OSF Healthcare System · Presence Health · South Shore Medical Center · Spectrum Health · St. Anthony Summit Medical Center · St. Luke's Health Network · Streamwood Behavioral Health Systems · Texas A & M Health Science Center · Uintah Basin Medical Center · UMass Medical School · University of Arkansas for Medical Sciences · University of Chicago Medical Center · UT Health Science Center at San Antonio · UT Southwestern Medical Center
Set up Wednesday. Two full days of meetings. Home Friday afternoon.
Same schedule in Columbus and Detroit.
- Wednesday afternoonSponsors set up their exhibits. Everyone checks in.
- ThursdayThe full day: facility case studies, booked 1-on-1s, the reception and dinner.
- FridayMorning case studies, more 1-on-1s, closing lunch. On the road by mid-afternoon.
The hour-by-hour plan and the venues
| Time | Wednesday | Thursday | Friday |
|---|---|---|---|
| 7:00 AM | Breakfast at your company table | Breakfast at your company table | |
| 8:00–10:00 AM | Facility case studies | Facility case studies | |
| 10:00 AM | Coffee and shop talk in the exhibit room | Pre-booked 20-minute 1-on-1s at your table | |
| 11:00 AM | Facility case studies | Facility case studies | |
| 12:00 PM | Lunch with your booked 1-on-1 meetings | Closing lunch with your booked 1-on-1 meetings | |
| 1:00 PM | Facility case studies | Facility case studies, then head home | |
| 2:00 PM | Sponsor setup and check-in | Pre-booked 20-minute 1-on-1s at your table | |
| 3:00 PM | Sponsor setup and check-in | Coffee and shop talk in the exhibit room | |
| 3:30 PM | Sponsor setup and check-in | Facility case studies | |
| 5:00–7:00 PM | Sponsor setup and check-in | Reception and dinner, with more 1-on-1s |
The full package's 15 pre-booked 20-minute 1-on-1s run Thursday and Friday: in the meeting blocks above, at lunch, and at the reception. Each is with a facility leader who asked to meet you, at your company table. You get your meeting schedule before you arrive, and the delegate list, with names, titles and organizations, 30 days before the summit.


Venue photos via Wikimedia Commons: Hilton Columbus Downtown by Ɱ (CC BY-SA 4.0); Renaissance Center by Crisco 1492 (public domain).
The program: facility leaders come to hear how other facilities fixed it.
The program is built from projects facilities actually finished, presented by the facility and the company that did the work. Every backup power category has room for more. If you've solved a problem like these, your story belongs on this program.
-
UPS & transfer switchesInvited
Parkview Regional Medical Center, Indiana ties 8 MW of generators to 32 bypass-isolation transfer switches
A 10-section ASCO 7000 Series power control system and 32 bypass-isolation automatic transfer switches bring three 2 MW generators online in an outage; by 2020 the ASCO equipment connected 8 MW of generator capacity with room for more (as reported by ASCO Power Technologies)
The problem: The 300-plus-bed hospital needed reliable backup power for life-safety and critical loads, and room to expand it without disrupting care.
Published result: A 10-section ASCO 7000 Series power control system and 32 bypass-isolation automatic transfer switches bring three 2 MW generators online in an outage; by 2020 the ASCO equipment connected 8 MW of generator capacity with room for more (as reported by ASCO Power Technologies)
Invited: ASCO Power Technologies and Parkview Health · Read the published case
-
Service & fuelInvited
Penn State Health Milton S. Hershey Medical Center, Pennsylvania keeps 30,000 gallons of generator diesel clean with automated fuel polishing
Two AXI International FPS-LX-F automated fuel polishing systems, one in each generator enclosure, each servicing a 13,000-gallon belly tank, with 30,000 gallons of fuel on hand in the storage tank; before the permanent systems, the mobile polishers would still remove 200 gallons of sludge from the fuel tank even though samples always passed; no cost figures published (as reported by Health Facilities Management, September 2017)
The problem: Annual fuel samples always passed the lab tests, yet each visit by a mobile fuel polishing service still pulled sludge out of the generator tanks, and the hospital must run mandatory 30-minute burn tests and 90-minute to four-hour load bank tests on its emergency generators.
Published result: Two AXI International FPS-LX-F automated fuel polishing systems, one in each generator enclosure, each servicing a 13,000-gallon belly tank, with 30,000 gallons of fuel on hand in the storage tank; before the permanent systems, the mobile polishers would still remove 200 gallons of sludge from the fuel tank even though samples always passed; no cost figures published (as reported by Health Facilities Management, September 2017)
Invited: AXI International and Penn State Health · Read the published case
-
GeneratorsInvited
CoreSite's downtown Chicago data center, Illinois replaces its rooftop generators with no impact on customers
Four Cummins 2 MW generator sets, an 8 MW pre-integrated system with UL891 paralleling switchgear and a digital master control, installed with rental power during the changeover; completed ahead of schedule with no impact to CoreSite's customers (as reported by Cummins)
The problem: An aging rooftop standby power system on a seven-story colocation building had to be replaced while every client stayed backed up during utility outages.
Published result: Four Cummins 2 MW generator sets, an 8 MW pre-integrated system with UL891 paralleling switchgear and a digital master control, installed with rental power during the changeover; completed ahead of schedule with no impact to CoreSite's customers (as reported by Cummins)
Invited: Cummins and CoreSite · Read the published case
See all 9 stories, in 3 categories, and how a session runs
- 1The problemWhat was happening at the facility.
- 2The costEnergy, maintenance, downtime or lost output.
- 3The decisionThe options they weighed, and why this one.
- 4The workWhat changed, how long it took, what went wrong.
- 5The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
- 6The lessonsWhat another facility should check first.
-
Generators
3 stories invited · 1 open slot-
Invited
CoreSite's downtown Chicago data center, Illinois replaces its rooftop generators with no impact on customers
Four Cummins 2 MW generator sets, an 8 MW pre-integrated system with UL891 paralleling switchgear and a digital master control, installed with rental power during the changeover; completed ahead of schedule with no impact to CoreSite's customers (as reported by Cummins)
The problem: An aging rooftop standby power system on a seven-story colocation building had to be replaced while every client stayed backed up during utility outages.
Published result: Four Cummins 2 MW generator sets, an 8 MW pre-integrated system with UL891 paralleling switchgear and a digital master control, installed with rental power during the changeover; completed ahead of schedule with no impact to CoreSite's customers (as reported by Cummins)
Invited: Cummins and CoreSite · Read the published case
-
Invited
Terre Haute Regional Hospital, Indiana adds two 1,250 kW generators without shutting down
Two Generac 1250 kW diesel generators with transfer switches and paralleling switchgear, plus generator backup for air conditioning; the plan kept the hospital fully operating through nearly 50 utility power interruptions during the changeover (as reported by Healthcare Facilities Today)
The problem: The 278-bed Level II trauma center needed more power capacity and emergency backup redundancy for an aging facility.
Published result: Two Generac 1250 kW diesel generators with transfer switches and paralleling switchgear, plus generator backup for air conditioning; the plan kept the hospital fully operating through nearly 50 utility power interruptions during the changeover (as reported by Healthcare Facilities Today)
Invited: Generac and its distributor EVAPAR, with Terre Haute Regional Hospital · Read the published case
-
Invited
OHSU's Vista Pavilion, Oregon can run its whole 14-story cancer tower on three Cat generators
Three Cat 3516C diesel generators, 2 MW each, 6 MW in all, with N+1 redundancy and Cat switchgear; the building transfers to generator power in less than 10 seconds, and about 50,000 gallons of diesel give at least 96 hours of runtime (as reported by Caterpillar's RunReady magazine)
The problem: The new 128-bed cancer tower needed backup power for patient care, life safety systems and elevators, and winter storms bring periodic outages.
Published result: Three Cat 3516C diesel generators, 2 MW each, 6 MW in all, with N+1 redundancy and Cat switchgear; the building transfers to generator power in less than 10 seconds, and about 50,000 gallons of diesel give at least 96 hours of runtime (as reported by Caterpillar's RunReady magazine)
Invited: Caterpillar and Peterson Power Systems, with Oregon Health & Science University · Read the published case
- Open slot
Your customer's story goes here.
Solved a facility problem in this category? Propose it for the program.
-
-
UPS & transfer switches
3 stories invited · 1 open slot-
Invited
Parkview Regional Medical Center, Indiana ties 8 MW of generators to 32 bypass-isolation transfer switches
A 10-section ASCO 7000 Series power control system and 32 bypass-isolation automatic transfer switches bring three 2 MW generators online in an outage; by 2020 the ASCO equipment connected 8 MW of generator capacity with room for more (as reported by ASCO Power Technologies)
The problem: The 300-plus-bed hospital needed reliable backup power for life-safety and critical loads, and room to expand it without disrupting care.
Published result: A 10-section ASCO 7000 Series power control system and 32 bypass-isolation automatic transfer switches bring three 2 MW generators online in an outage; by 2020 the ASCO equipment connected 8 MW of generator capacity with room for more (as reported by ASCO Power Technologies)
Invited: ASCO Power Technologies and Parkview Health · Read the published case
-
Invited
TriRivers Health Partners' Rockford, Illinois hosting data center backs two health systems' records with a redundant Eaton UPS system
An Eaton 9390 double-conversion UPS (94 percent efficiency, 0.90 output power factor), a 125 kVA power distribution unit, managed ePDUs, switchgear, custom busway, Paramount enclosures with rack-level heat containment and Intelligent Power Manager software, with a full B-side utility, generator and UPS room feeding B-busway in each room; new racks come online in a matter of hours rather than a period of days; the system serves over 5,000 users at more than 50 locations in Illinois and Wisconsin; no savings figures published (as reported by Eaton, June 2016)
The problem: The healthcare IT venture of SwedishAmerican Health System (Rockford) and FHN (Freeport) runs a 33,000 sq ft hosting data center plus a backup site at FHN Memorial Hospital, and needed a scalable, fully redundant power system for more than 1,000 virtual mission-critical servers and electronic health records that cannot go down, even for maintenance.
Published result: An Eaton 9390 double-conversion UPS (94 percent efficiency, 0.90 output power factor), a 125 kVA power distribution unit, managed ePDUs, switchgear, custom busway, Paramount enclosures with rack-level heat containment and Intelligent Power Manager software, with a full B-side utility, generator and UPS room feeding B-busway in each room; new racks come online in a matter of hours rather than a period of days; the system serves over 5,000 users at more than 50 locations in Illinois and Wisconsin; no savings figures published (as reported by Eaton, June 2016)
Invited: Eaton and TriRivers Health Partners · Read the published case
-
Invited
Expedient's Dublin, Ohio data center protects a Tier III+ build with Vertiv UPS
Two Vertiv Liebert NXL 800 kVA UPS units (two more planned), 16 Liebert 225 kVA PDUs and diesel generator backup for phase one's 29,000 sq ft and 575 cabinets; installed, tested and commissioned on schedule with no service interruptions (as reported by Vertiv)
The problem: The cloud provider's new Tier III+ data center needed concurrently maintainable A/B power and protection from electrical anomalies to meet strict SLAs.
Published result: Two Vertiv Liebert NXL 800 kVA UPS units (two more planned), 16 Liebert 225 kVA PDUs and diesel generator backup for phase one's 29,000 sq ft and 575 cabinets; installed, tested and commissioned on schedule with no service interruptions (as reported by Vertiv)
Invited: Vertiv and Donwil, with Expedient · Read the published case
- Open slot
Your customer's story goes here.
Solved a facility problem in this category? Propose it for the program.
-
-
Service & fuel
3 stories invited · 1 open slot-
Invited
Penn State Health Milton S. Hershey Medical Center, Pennsylvania keeps 30,000 gallons of generator diesel clean with automated fuel polishing
Two AXI International FPS-LX-F automated fuel polishing systems, one in each generator enclosure, each servicing a 13,000-gallon belly tank, with 30,000 gallons of fuel on hand in the storage tank; before the permanent systems, the mobile polishers would still remove 200 gallons of sludge from the fuel tank even though samples always passed; no cost figures published (as reported by Health Facilities Management, September 2017)
The problem: Annual fuel samples always passed the lab tests, yet each visit by a mobile fuel polishing service still pulled sludge out of the generator tanks, and the hospital must run mandatory 30-minute burn tests and 90-minute to four-hour load bank tests on its emergency generators.
Published result: Two AXI International FPS-LX-F automated fuel polishing systems, one in each generator enclosure, each servicing a 13,000-gallon belly tank, with 30,000 gallons of fuel on hand in the storage tank; before the permanent systems, the mobile polishers would still remove 200 gallons of sludge from the fuel tank even though samples always passed; no cost figures published (as reported by Health Facilities Management, September 2017)
Invited: AXI International and Penn State Health · Read the published case
-
Invited
Kettering Health Miamisburg, Ohio replaces its substation while patients stay on power
Rental equipment and repurposed components temporarily fed all 25 electrical loads; non-critical outages were kept to weekend nights and transfer switch outages to 30 minutes or less; the work took almost two months with seven weekend shutdowns, and the hospital kept delivering uninterrupted care (as reported by HEAPY)
The problem: The hospital's substation had to be replaced in its existing location while the ICU and life safety systems stayed powered.
Published result: Rental equipment and repurposed components temporarily fed all 25 electrical loads; non-critical outages were kept to weekend nights and transfer switch outages to 30 minutes or less; the work took almost two months with seven weekend shutdowns, and the hospital kept delivering uninterrupted care (as reported by HEAPY)
Invited: HEAPY and Ohio CAT, with Kettering Health · Read the published case
-
Invited
A hyperscale data center under construction in South Bend, Indiana (developer unnamed) commissions on 60 MW of Aggreko rental power for six months
A 60 MW turnkey temporary power system of Tier 4 Final 1,200 kW twin-pack generators in 40 MW blocks with N+2 redundancy across generation, transformation and distribution, medium-voltage distribution, a fuel management system, SCADA control and 24/7 on-site operations and maintenance: 99.1 percent uptime over the 6-month operation, mobilized on 1 month of notice, 24 hours of on-site fuel storage at full load, and the facility commissioned within the customer's tolerance window (as reported by Aggreko)
The problem: Permanent utility power was unavailable because of extended grid lead times, so the site could not finish commissioning and its timeline and return on investment were at risk.
Published result: A 60 MW turnkey temporary power system of Tier 4 Final 1,200 kW twin-pack generators in 40 MW blocks with N+2 redundancy across generation, transformation and distribution, medium-voltage distribution, a fuel management system, SCADA control and 24/7 on-site operations and maintenance: 99.1 percent uptime over the 6-month operation, mobilized on 1 month of notice, 24 hours of on-site fuel storage at full load, and the facility commissioned within the customer's tolerance window (as reported by Aggreko)
Invited: Aggreko and the data center developer (unnamed in the case study) · Read the published case
- Open slot
Your customer's story goes here.
Solved a facility problem in this category? Propose it for the program.
-
"Invited" means invited: none of these companies has confirmed. Results are as published by the supplier; we ask every presenter for dates, baseline costs and verified results before the program is final.






“We're really excited and happy with the types of people we met. Many end users, many people motivated to make decisions about reducing their energy cost, putting power on site.”
Mike Norelli, Sales Leader, Distributed Power North America, GE. The photo is the Doosan Fuel Cell exhibit at a past FMA summit.
Real FMA Summit rooms. No stock photography.
Get in front of the decision makers, not the crowd.
Full package
- 15 guaranteed pre-scheduled meetings
- A 20-minute case-study session
- A fully furnished exhibit
- Your corporate dining table
- Three people at full access
Add meetings up to 40 at $1,500 each.
- Any booked meeting that doesn’t happen is added to your next summit, written into your sponsor agreement.
- Each summit is capped at 20 sponsors, each solving a different problem for the people in the room.
Want the category to yourself? Each summit is capped at 20 sponsors. To talk about your category, .
- Facility leaders ask to meet you. We seat the ones who asked at your table.
- Your booked meeting schedule arrives before the summit.
- Any booked meeting that doesn't happen is added to your next summit: miss 3, and you get 15 plus 3. It's written into your sponsor agreement.
- You get the delegate list 30 days before the summit: names, titles and organizations.
- Three people are included with full access. Extra passes are $2,900 each.
Or pick only what you wantMeetings from $15,000, talk $15,000, exhibit $15,000, dining table $10,000
One category, one summit. Prices in USD. Whatever you pick includes three people with full access. Meetings are booked on an opt-in basis before the summit; any booked meeting that doesn't happen is added to your next summit.
No vendor walks the show. Solution providers attend only as sponsors. A vendor that has not sponsored cannot register, attend or work the room, so the facility leaders you meet are not being chased by your competitors in the hallway.
The ten questions every sponsor asks.
Past sponsors answer all ten in one 5-minute film. Pick a question and the film jumps to its answer.
Now ask your own questions.
Answered on camera by past FMA sponsors. Recorded at past FMA summits.
Who's behind it.


Started FMA in Montreal in 2007 and has run every summit himself: 35 of them, 17,000+ meetings. Capped at 20 sponsors per summit, meetings booked before anyone arrives, and no vendor walks the show.
Read the full story





Backup power sponsors were in 6 of the 35 summits. Every sponsor and speaker, as printed.
Open any programCummins presented at FMA's Data Center Summit in Chicago. The summit is capped at 20 sponsors.
Twenty minutes with Joe Piazza: who is coming to your summit, where your company fits among its 20 sponsors, and what the agreement says. The sponsor brief has the delegate profile, the full agenda and the itemized pricing.
35 summits since 2007. Joe Piazza, who founded FMA, runs every summit himself. The videos on this page are from past summits.