Executive Summits · by the Facility Management Alliance
Commercial & Campus Roofing Summit
Meet the facility leaders who check the ceiling tiles every time it rains.
Each summit is capped at 20 sponsors. Talk to Joe before it fills.
Who’s coming so far
24 organizations have confirmed they will send facility leaders: 6 hospitals, 8 universities and 10 commercial buildings.
- Cleveland Clinic
- Ohio State University Wexner Medical Center
- Cleveland Clinic Fairview Hospital
- The Christ Hospital
- Cleveland Clinic Hillcrest Hospital
- OhioHealth Riverside Methodist Hospital
- Ohio State University
- University of Michigan
- University of Cincinnati
- University of Kentucky
- University of Pittsburgh
- Kent State University
- Ohio University
- Wayne State University
- Key Tower
- Terminal Tower
- Great American Tower at Queen City Square
- 200 Public Square
- Sherwin-Williams Headquarters
- Carew Tower
- LeVeque Tower
- Huntington Center
- One Nationwide Plaza
- AEP Building
Two days with facility directors, facilities managers, capital projects managers and property managers from universities, school districts, government buildings and commercial properties who own the roofs, walls and windows: 20-year-old roofs that leak every storm, tear-off quotes that blow the budget, single-pane windows and one summer break to get it all done. Pre-scheduled 1-on-1 meetings. No expo hall.
The people who sign the PO for roofing projects.
Invited from facilities across Ohio, Michigan, Indiana, Pennsylvania and Kentucky. Every delegate is screened by title and facility.
Titles
- VP or Director of Facilities Signs off on the roof replacement
- Capital Projects Manager Plans the roof and window budget
- Facilities Manager Chases the leaks
- Property Manager Tenant comfort and operating costs
- Energy Manager Insulation, windows and the heating bill
Industries we're inviting
- K-12 school districts Roofs replaced over summer break
- Universities and colleges Dozens of roofs on different schedules
- Government buildings Public bids and tight budgets
- Commercial offices Tenants, windows and comfort
- Warehouses and retail Big flat roofs
Past FMA delegates include energy and facility leaders from Toyota, General Motors, Sanofi, The Estée Lauder Companies and Walgreens.
Who came before.
The organizations and titles that came to past FMA summits, and the facility leaders who spoke. Past delegates are not 2027 attendees; they show who this audience is.
Who decides on roofing projects
Run the buildings
Director of Facilities
Facilities Manager
Facility Manager
Own energy costs
Energy Manager
Energy Engineer
Energy Program Manager
Write the spec
Electrical Engineer
Mechanical Engineer
Director of Engineering
Lead sustainability
Director of Sustainability
Sustainability Manager
Sustainability Coordinator
Build and renovate
Project Manager
Architect of the Capitol
Architectural Draftsman
Past facility delegates in each role, with the most common titles. Each person is counted once, in the first role their title fits; the other 194 of the 721 hold other titles.
Past speakers and delegates, by type of facility
Universities, colleges and schools
21 speakers · 188 delegates






Hospitals and health systems
9 speakers · 86 delegates





Office towers, corporate campuses and stores
16 speakers · 141 delegates






Data centers
5 speakers · 17 delegates






Cities, counties and government
35 speakers · 168 delegates






See seniority and past speakers
Seniority of past delegates: 74 C-suite, presidents & VPs · 215 directors · 248 managers · 96 engineers & specialists · 88 with other or no titles. Total 721.
See every organization and the titles it sent, by type of facility
Counts come from past FMA delegate lists, not confirmed attendance. Organization names show where past delegates and speakers worked. They are not sponsors of FMA Summits and do not endorse it.
They came back.
Past FMA sponsors, and how many summits each one sponsored, from the printed programs.
- 7BASFRoofing · 7 summits
- 4BLUEFINRoofing · 4 summits
- 2Knauf InsulationRoofing · 2 summits
- 2North American RoofingRoofing · 2 summits
- 2ROXULRoofing · 2 summits
- 2The Dow Chemical CompanyRoofing · 2 summits
- 18US LED18 summits
- 17Kaeser Compressors17 summits
- 14Covanta14 summits
- 14Solution Dynamics14 summits
- 10Advanced Power Technologies10 summits
- 7LG Electronics7 summits
See the other 102 companies that sponsored two or more FMA summits
3M 2 · Acuity Brands 4 · Advanced Green Technologies 3 · Advantix Systems 8 · AERCO International 5 · AgriPower 6 · Air Balance 2 · AmbiRad 3 · Ameresco 2 · Armstrong Fluid Technology 5 · Badger Meter 2 · Be Power Tech 2 · Bio-Reaction Industries 2 · Bosch Thermotechnology 2 · Burns & McDonnell Engineering 3 · Camfil 2 · Capstone Turbine 2 · Chelsea Group 2 · Cleaver-Brooks 4 · ConDex Energy 2 · Constellation Energy 5 · Control Instruments 2 · CopperTree Analytics 3 · Cushman & Wakefield 2 · Cypress Envirosystems 5 · Doosan Fuel Cell America 3 · DTE Energy Services 2 · Dyson 4 · Eaton 3 · EcoSafe Zero Waste 2 · EDF Renewable Energy 2 · Edison Energy 2 · Emerson Climate Technologies 2 · Energy Management Systems 4 · Energy Source 2 · EnerNOC 2 · Enertech Global 2 · EnterSolar 2 · Environmental Resources Management 2 · EQUIDEX Energy 7 · ERS International 3 · ETwater Systems 2 · Every Watt Matters 2 · Eye Lighting International 3 · Facility Solutions Group 2 · FacilityConneX 2 · Fellon-McCord & Associates 3 · GDF SUEZ Energy NA 2 · GE Distributed Power 2 · GE Solar 2 · Gexpro 3 · GI Energy 2 · Green Ballast 2 · Greenstar Recycling 6 · Greenworks Energy Solutions 3 · Harris Lighting 2 · Heritage Interactive Services 2 · Hurst Boiler & Welding Co. 2 · IBM 4 · ICETEC Energy Services 2 · ICONICS 3 · Invensys Operations Management 2 · JLL 4 · Jorgensen Facilities Services 5 · K+S Services 2 · KDC Solar 2 · KERAMIDA 2 · KVAR Energy Savings 3 · LEDtronics 2 · Lutron Electronics Co. 3 · MaxLite 2 · MCEnergy 2 · MEP Associates 2 · MPC Energy 5 · Munters 2 · Newton Distributing Company 2 · Nortec 3 · North America Power Partners 2 · OAKLEAF 4 · Optimum Energy 2 · Orion Energy Systems 2 · OSRAM SYLVANIA 5 · Pfister Energy 2 · PowerSecure 5 · Rinnai America 2 · Rockwell Automation 2 · Rubicon Global 2 · SAP America 2 · Schneider Electric 6 · Shaw Environmental & Infrastructure 5 · Sloan 2 · Smardt Chiller Group 8 · Solar UV Solutions 3 · Solatube International 3 · Steril-Aire 2 · Synergy Investment 6 · Thermal Energy International 3 · Trane 2 · Tremco Roofing and Building Maintenance 2 · Viridity Energy 2 · Wahaso - Water Harvesting Solutions 2 · Zurn Industries 2
In writing, from past sponsors and delegates.
Their words, not ours.
“…four major roofing projects”
Past sponsorMoses M. Clark Jr.Sr. National Roofing Accounts Manager, BASF CorporationRead the whole quote
“…It is my pleasure to discuss the success we have had as a result of your conference. We have this past year alone four major roofing projects coming out from: Wake Forest University; Flanders Filters Corporation; Barnes & Noble; Stockton University. … I would highly recommend that you consider the program…”
“Every attendee is a potential lead.”
Read the whole quote
“More intimate. More focused. Every attendee is a potential lead. …”
Past sponsorAndrew WagnerRegistered Architect, BASF Corporation“Phenomenal format.”
Read the whole quote
“…Phenomenal format. Really liked the schedule nature of it. The one on one conversations, the predetermined meetings and step up discussions. The ability to network, spend time talking not walking by in a rush worked really well, especially compared to standard trade show format where you’re looking for people to walk by and you’re trying to have short conversations that have less meaning. … It was just a great format and certainly look forward to doing another one.”
Past sponsorPat ScudderPresident, Protective Industrial Polymers“I like the caliber of the attendees, decision-makers.”
Read the whole quote
“I like the caliber of the attendees, decision-makers. The event is heavily focused on tracking, managing & reducing energy usage loads and I like being the only construction materials supplier here. Assigned seats at meals work well.”
Past sponsorChris RosemondConstruction Science Architect, BASF CorporationSee 12 moreShow fewer
“…We enjoyed this show. Good contacts with current projects for our roofing products. The staff were very nice, helpful setting up meeting with key prospects. We will return.”
Past sponsorMoses M. Clark Jr.Sr. National Roofing Accounts Manager, BASF Corporation“The FMA Summit has been a really great venue in terms of just having these really rich dialogues with attendees regarding sustainability…”
Past sponsorLisa BarnardSenior Advisor, Commercial Construction, BASF“The setting for the Summit proved to be very valuable as it provided an intimate and less aggressive environment for vendors to create meaningful partnerships with customers. I was able to get answers to my pressing facilities’ needs and forge partnerships with various vendors that can provide the solutions I need without all the wasted time on cold calls.”
Past delegateMary-Ann IbeziakoDirector of Engineering and Energy, University of Maryland“Your conference was well-organized and I have a mountain of contacts to work through for what hopes to be some very beneficial collaboration. …”
Past delegateNate VerhanovitzPerformance Engineer, Power and Water, Infrastructure Planning and Facilities, Michigan State University“This is a great conference. I was able to talk one on one with a lot of vendors. It is a very intimate setting where you can have very deep meaningful conversations.”
Past delegateMathew EmdenEnergy Champion, Principia College“I was able to meet several business reps who may be able to support our business in the future. The facility leadership presentation given by Kurtis Jetsel was exceptional.”
“The FMA Summit is an ideal vendor/user experience offered in a comfortable environment with outstanding food & refreshments. The structure of the Summit maximizes face-time among vendors and users…”
Past delegateBert JacobsonDean for Environmental and Institutional Sustainability, Kankakee Community College“…I believe that we’ve made some valuable connections that can develop into business relationships.”
“Very informative, a great forum to bring people together to discuss ideas and available products…”
“The Summit was well run and the presentations were informative. There were valuable discussions and a number of contacts that I gained from this experience.”
“Great exposure to market intelligence, latest technology, and emerging trends. Presentations are just long enough to maintain focus.”
“Very straight forward. Plenty of knowledge in the Summit. Everyone seemed to benefit from it.”
Set up Wednesday. Two full days of meetings. Home Friday afternoon.
Same schedule in Columbus and Detroit.
- Wednesday afternoonSponsors set up their exhibits. Everyone checks in.
- ThursdayThe full day: facility case studies, booked 1-on-1s, the reception and dinner.
- FridayMorning case studies, more 1-on-1s, closing lunch. On the road by mid-afternoon.
The hour-by-hour plan and the venues
| Time | Wednesday | Thursday | Friday |
|---|---|---|---|
| 7:00 AM | Breakfast at your company table | Breakfast at your company table | |
| 8:00–10:00 AM | Facility case studies | Facility case studies | |
| 10:00 AM | Coffee and shop talk in the exhibit room | Pre-booked 20-minute 1-on-1s at your table | |
| 11:00 AM | Facility case studies | Facility case studies | |
| 12:00 PM | Lunch with your booked 1-on-1 meetings | Closing lunch with your booked 1-on-1 meetings | |
| 1:00 PM | Facility case studies | Facility case studies, then head home | |
| 2:00 PM | Sponsor setup and check-in | Pre-booked 20-minute 1-on-1s at your table | |
| 3:00 PM | Sponsor setup and check-in | Coffee and shop talk in the exhibit room | |
| 3:30 PM | Sponsor setup and check-in | Facility case studies | |
| 5:00–7:00 PM | Sponsor setup and check-in | Reception and dinner, with more 1-on-1s |
The full package's 15 pre-booked 20-minute 1-on-1s run Thursday and Friday: in the meeting blocks above, at lunch, and at the reception. Each is with a facility leader who asked to meet you, at your company table. You get your meeting schedule before you arrive, and the delegate list, with names, titles and organizations, 30 days before the summit.


Venue photos via Wikimedia Commons: Hilton Columbus Downtown by Ɱ (CC BY-SA 4.0); Renaissance Center by Crisco 1492 (public domain).
The program: facility leaders come to hear how other facilities fixed it.
The program is built from projects facilities actually finished, presented by the facility and the company that did the work. Every roofing category has room for more. If you've solved a problem like these, your story belongs on this program.
-
Roofing & coatingsInvited
Minerva Middle School, Ohio ends years of leaks with a new membrane roof
Damschroder Roofing tore the roof off down to the deck and installed two layers of Duro-Guard ISO insulation (R-30), coverboard and a Duro-Tuff 50 mil membrane with vinyl ribs and snow retention: 90,750 sq ft, started in May 2023 and finished three months later around the school's testing schedule, with a 20-year Duro-Last NDL warranty; no cost figure given (as reported by Duro-Last, 2026).
The problem: Despite repeated repairs, the 20-year-old school's steep, segmented shingle roof let wind-driven rain into the hallways and cafeteria.
Published result: Damschroder Roofing tore the roof off down to the deck and installed two layers of Duro-Guard ISO insulation (R-30), coverboard and a Duro-Tuff 50 mil membrane with vinyl ribs and snow retention: 90,750 sq ft, started in May 2023 and finished three months later around the school's testing schedule, with a 20-year Duro-Last NDL warranty; no cost figure given (as reported by Duro-Last, 2026).
Invited: Duro-Last, with Minerva Local School District · Read the published case
-
Windows, insulation & envelopeInvited
400 Market Street, Pennsylvania cuts heating and cooling energy 25% without replacing its windows
Interior low-e, argon-filled secondary glazing from Renovate by Berkowitz, installed in 2011 at roughly half the cost of a traditional window replacement and 2-3 times quicker: 25 percent whole-building heating and cooling energy savings and 35-60 percent in the perimeter offices in a 2012-2013 DOE study, with less street noise (measured; as reported by the Attachments Energy Rating Council, 2020).
The problem: Poor single-pane windows were the weak point of a 12-story, 200,000 sq ft office building from 1972, and full replacement would have meant moving tenants out.
Published result: Interior low-e, argon-filled secondary glazing from Renovate by Berkowitz, installed in 2011 at roughly half the cost of a traditional window replacement and 2-3 times quicker: 25 percent whole-building heating and cooling energy savings and 35-60 percent in the perimeter offices in a 2012-2013 DOE study, with less street noise (measured; as reported by the Attachments Energy Rating Council, 2020).
Invited: Renovate by Berkowitz and Kaiserman Company · Read the published case
-
Roofing & coatingsInvited
City of Parma, Ohio re-roofs its police station and justice center with spray foam
West Roofing Systems removed the gravel and the EPDM, replaced all wet insulation, added fiberboard, about 1.5 inches of NCFI spray foam and American WeatherStar coating with granules: 59,170 sq ft finished in 56 days in 2024, with a 20-year full-system, no-dollar-limit renewable warranty; no cost figure given (as reported by West Roofing Systems).
The problem: The gravel-covered EPDM roof over the police station and justice center had wet insulation that had to be found and replaced.
Published result: West Roofing Systems removed the gravel and the EPDM, replaced all wet insulation, added fiberboard, about 1.5 inches of NCFI spray foam and American WeatherStar coating with granules: 59,170 sq ft finished in 56 days in 2024, with a 20-year full-system, no-dollar-limit renewable warranty; no cost figure given (as reported by West Roofing Systems).
Invited: West Roofing Systems, with the City of Parma · Read the published case
See all 6 stories, in 2 categories, and how a session runs
- 1The problemWhat was happening at the facility.
- 2The costEnergy, maintenance, downtime or lost output.
- 3The decisionThe options they weighed, and why this one.
- 4The workWhat changed, how long it took, what went wrong.
- 5The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
- 6The lessonsWhat another facility should check first.
-
Roofing & coatings
3 stories invited · 1 open slot-
Invited
Minerva Middle School, Ohio ends years of leaks with a new membrane roof
Damschroder Roofing tore the roof off down to the deck and installed two layers of Duro-Guard ISO insulation (R-30), coverboard and a Duro-Tuff 50 mil membrane with vinyl ribs and snow retention: 90,750 sq ft, started in May 2023 and finished three months later around the school's testing schedule, with a 20-year Duro-Last NDL warranty; no cost figure given (as reported by Duro-Last, 2026).
The problem: Despite repeated repairs, the 20-year-old school's steep, segmented shingle roof let wind-driven rain into the hallways and cafeteria.
Published result: Damschroder Roofing tore the roof off down to the deck and installed two layers of Duro-Guard ISO insulation (R-30), coverboard and a Duro-Tuff 50 mil membrane with vinyl ribs and snow retention: 90,750 sq ft, started in May 2023 and finished three months later around the school's testing schedule, with a 20-year Duro-Last NDL warranty; no cost figure given (as reported by Duro-Last, 2026).
Invited: Duro-Last, with Minerva Local School District · Read the published case
-
Invited
City of Parma, Ohio re-roofs its police station and justice center with spray foam
West Roofing Systems removed the gravel and the EPDM, replaced all wet insulation, added fiberboard, about 1.5 inches of NCFI spray foam and American WeatherStar coating with granules: 59,170 sq ft finished in 56 days in 2024, with a 20-year full-system, no-dollar-limit renewable warranty; no cost figure given (as reported by West Roofing Systems).
The problem: The gravel-covered EPDM roof over the police station and justice center had wet insulation that had to be found and replaced.
Published result: West Roofing Systems removed the gravel and the EPDM, replaced all wet insulation, added fiberboard, about 1.5 inches of NCFI spray foam and American WeatherStar coating with granules: 59,170 sq ft finished in 56 days in 2024, with a 20-year full-system, no-dollar-limit renewable warranty; no cost figure given (as reported by West Roofing Systems).
Invited: West Roofing Systems, with the City of Parma · Read the published case
-
Invited
Utica High School, Ohio replaces a roof that had partly blown off, in 12 days
All Weather Systems repaired the deck under new 92-foot EXCEPTIONAL Metals EM LokSeam panels on the sloped roof and welded Duro-Tuff membrane over Duro-Guard insulation on the flat sections: finished in 12 days over summer break, with a 20-year weathertight warranty on the metal and a 20-year NDL warranty on the membrane; no cost figure given (as reported by RoofersCoffeeShop for Duro-Last, October 2024).
The problem: The old standing seam and TPO roof had caused problems for 15 years, including a partial blow-off, and school officials worried about students and staff in Ohio's winter storms.
Published result: All Weather Systems repaired the deck under new 92-foot EXCEPTIONAL Metals EM LokSeam panels on the sloped roof and welded Duro-Tuff membrane over Duro-Guard insulation on the flat sections: finished in 12 days over summer break, with a 20-year weathertight warranty on the metal and a 20-year NDL warranty on the membrane; no cost figure given (as reported by RoofersCoffeeShop for Duro-Last, October 2024).
Invited: Duro-Last and EXCEPTIONAL Metals, with Utica High School · Read the published case
- Open slot
Your customer's story goes here.
Solved a facility problem in this category? Propose it for the program.
-
-
Windows, insulation & envelope
3 stories invited · 1 open slot-
Invited
400 Market Street, Pennsylvania cuts heating and cooling energy 25% without replacing its windows
Interior low-e, argon-filled secondary glazing from Renovate by Berkowitz, installed in 2011 at roughly half the cost of a traditional window replacement and 2-3 times quicker: 25 percent whole-building heating and cooling energy savings and 35-60 percent in the perimeter offices in a 2012-2013 DOE study, with less street noise (measured; as reported by the Attachments Energy Rating Council, 2020).
The problem: Poor single-pane windows were the weak point of a 12-story, 200,000 sq ft office building from 1972, and full replacement would have meant moving tenants out.
Published result: Interior low-e, argon-filled secondary glazing from Renovate by Berkowitz, installed in 2011 at roughly half the cost of a traditional window replacement and 2-3 times quicker: 25 percent whole-building heating and cooling energy savings and 35-60 percent in the perimeter offices in a 2012-2013 DOE study, with less street noise (measured; as reported by the Attachments Energy Rating Council, 2020).
Invited: Renovate by Berkowitz and Kaiserman Company · Read the published case
-
Invited
University of Toledo, Ohio replaces nearly 1,200 windows in its 1931 clock-tower hall and expects to break even in 15 years
Nearly 1,200 Graham 6700 Series windows replicating the leaded-glass originals, installed by Jamieson Ricca Windows: the energy savings are expected to let the State of Ohio's $1 million capital investment break even in 15 years, according to the university's vice president of corporate administration (projected; as reported by Graham Architectural Products, July 2016).
The problem: University Hall, the campus's most iconic building, had leaded-glass original windows, and the university wanted energy-efficient replacements that looked exactly like the originals on a short timeline.
Published result: Nearly 1,200 Graham 6700 Series windows replicating the leaded-glass originals, installed by Jamieson Ricca Windows: the energy savings are expected to let the State of Ohio's $1 million capital investment break even in 15 years, according to the university's vice president of corporate administration (projected; as reported by Graham Architectural Products, July 2016).
Invited: Graham Architectural Products and the University of Toledo · Read the published case
-
Invited
Denver Federal Center, Colorado halves air leakage in a federal office building
AeroBarrier pressurized the space and sealed it with an aerosol acrylic sealant, installed over two days: on the 4,462 sq ft demonstration site, third-party blower door tests showed 52.60% less air leakage, achieved in less than 7 hours including preparation and cleanup, at $1.0 to $1.25 per sq ft (measured; as reported by Oak Ridge National Laboratory for GSA's Green Proving Ground, August 2023).
The problem: GSA wanted to know whether automated air sealing could tighten the envelope of a two-story steel-frame office building that was already getting more insulation and high-performance windows.
Published result: AeroBarrier pressurized the space and sealed it with an aerosol acrylic sealant, installed over two days: on the 4,462 sq ft demonstration site, third-party blower door tests showed 52.60% less air leakage, achieved in less than 7 hours including preparation and cleanup, at $1.0 to $1.25 per sq ft (measured; as reported by Oak Ridge National Laboratory for GSA's Green Proving Ground, August 2023).
Invited: AeroBarrier and the U.S. General Services Administration · Read the published case
- Open slot
Your customer's story goes here.
Solved a facility problem in this category? Propose it for the program.
-
"Invited" means invited: none of these companies has confirmed. Results are as published by the supplier; we ask every presenter for dates, baseline costs and verified results before the program is final.






“The FMA Congress has been a really great venue in terms of having these really rich dialogues with attendees regarding sustainability, where they're headed.”
Lisa Barnard, Senior Advisor, Commercial Construction, BASF. BASF sponsored seven FMA summits; the photo is the BASF exhibit at a past summit.
Real FMA Summit rooms. No stock photography.
Get in front of the decision makers, not the crowd.
Full package
- 15 guaranteed pre-scheduled meetings
- A 20-minute case-study session
- A fully furnished exhibit
- Your corporate dining table
- Three people at full access
Add meetings up to 40 at $1,500 each.
- Any booked meeting that doesn’t happen is added to your next summit, written into your sponsor agreement.
- Each summit is capped at 20 sponsors, each solving a different problem for the people in the room.
Want the category to yourself? Each summit is capped at 20 sponsors. To talk about your category, .
- Facility leaders ask to meet you. We seat the ones who asked at your table.
- Your booked meeting schedule arrives before the summit.
- Any booked meeting that doesn't happen is added to your next summit: miss 3, and you get 15 plus 3. It's written into your sponsor agreement.
- You get the delegate list 30 days before the summit: names, titles and organizations.
- Three people are included with full access. Extra passes are $2,900 each.
Or pick only what you wantMeetings from $15,000, talk $15,000, exhibit $15,000, dining table $10,000
One category, one summit. Prices in USD. Whatever you pick includes three people with full access. Meetings are booked on an opt-in basis before the summit; any booked meeting that doesn't happen is added to your next summit.
No vendor walks the show. Solution providers attend only as sponsors. A vendor that has not sponsored cannot register, attend or work the room, so the facility leaders you meet are not being chased by your competitors in the hallway.
The ten questions every sponsor asks.
Past sponsors answer all ten in one 5-minute film. Pick a question and the film jumps to its answer.
Now ask your own questions.
Answered on camera by past FMA sponsors. Recorded at past FMA summits.
Who's behind it.


Started FMA in Montreal in 2007 and has run every summit himself: 35 of them, 17,000+ meetings. Capped at 20 sponsors per summit, meetings booked before anyone arrives, and no vendor walks the show.
Read the full story





Roofing sponsors were in 14 of the 35 summits. Every sponsor and speaker, as printed.
Open any programWest Roofing came back for a second FMA summit in Columbus. The summit is capped at 20 sponsors.
Twenty minutes with Joe Piazza: who is coming to your summit, where your company fits among its 20 sponsors, and what the agreement says. The sponsor brief has the delegate profile, the full agenda and the itemized pricing.
35 summits since 2007. Joe Piazza, who founded FMA, runs every summit himself. The videos on this page are from past summits.