Executive Summits · by the Future of Manufacturing Alliance
Industrial Refrigeration Summit for Manufacturing Plants
Meet the food plant leaders who can't afford a warm freezer.
Each summit is capped at 20 sponsors. Talk to Joe before it fills.
Who’s coming so far
21 manufacturers have confirmed they will send people. The target is 100+ plant leaders in the room by each summit.
- Honda
- GE Aerospace
- General Motors
- Stellantis / Jeep
- Procter & Gamble
- Cleveland-Cliffs
- Whirlpool
- Goodyear Tire & Rubber
- Parker Hannifin
- Swagelok
- Crown Equipment
- Lincoln Electric
- Sherwin-Williams
- + 8 very large manufacturers, not named at their request
Two days with plant engineering, refrigeration, maintenance and EHS leaders from Midwest food, beverage and dairy plants: aging ammonia systems, PSM paperwork, new refrigerant rules and compressors that run all night. Pre-scheduled 1-on-1 meetings. No expo hall.
The people who sign the PO for refrigeration projects.
Invited from plants across Ohio, Michigan, Indiana, Pennsylvania and Kentucky. Every delegate is screened by title and plant.

1,470plant leaders from 495 manufacturers have come to past FMA summits.1,033 of them pick the vendor, own the budget or sign off.
Who decides a plant purchase, and how many came
- Step 1287Find the problem, write the specEnergy Engineer, Facilities Engineer, Environmental Engineer
- Step 2560Pick the vendorFacilities Manager, Environmental Manager, Energy Manager
- Step 3337Own the budgetDirector of Engineering, Director of Operations, Director of Manufacturing
- Step 4136Sign offPlant Manager, General Manager, President
Who we invite to this summit
Each title, and what that person owns.
- Refrigeration / Utilities ManagerOwns the engine room
- Plant Engineering DirectorWrites the spec
- Maintenance ManagerCompressors, valves, uptime
- EHS / PSM ManagerAmmonia safety and PSM
- Plant ManagerSigns off on capex
Where past delegates worked
Plant leaders at past FMA summits, by industry.
Industries we are inviting to this summit: Meat and poultry (chill, freeze, hold) · Dairy (milk, cheese, ice cream) · Frozen foods (blast and spiral freezing) · Beverage and brewing (fermentation and cellars) · Bakery and snacks (dough rooms, finished goods).
Counts are past FMA delegates, each counted once. They show who this audience is; they are not 2027 attendees.
Past speakers and delegates, by industry
Food and beverage
12 speakers · 161 delegates






Automotive
10 speakers · 192 delegates






Machinery, equipment and electronics
7 speakers · 209 delegates






Chemicals, plastics and rubber
6 speakers · 120 delegates






Steel and metals
2 speakers · 82 delegates






Aerospace, pharma, building and consumer products
29 speakers · 667 delegates






They came back.
Past FMA sponsors, and how many summits each one sponsored, from the printed programs.
- 2Emerson Climate TechnologiesIndustrial refrigeration · 2 summits
- 18US LED18 summits
- 17Kaeser Compressors17 summits
- 14Covanta14 summits
- 14Solution Dynamics14 summits
- 10Advanced Power Technologies10 summits
- 8Smardt Chiller Group8 summits
- 7BASF7 summits
- 7EQUIDEX Energy7 summits
- 7LG Electronics7 summits
- 6AgriPower6 summits
- 6Greenstar Recycling6 summits
See the other 102 companies that sponsored two or more FMA summits
3M 2 · Acuity Brands 4 · Advanced Green Technologies 3 · Advantix Systems 8 · AERCO International 5 · Air Balance 2 · AmbiRad 3 · Ameresco 2 · Armstrong Fluid Technology 5 · Badger Meter 2 · Be Power Tech 2 · Bio-Reaction Industries 2 · BLUEFIN 4 · Bosch Thermotechnology 2 · Burns & McDonnell Engineering 3 · Camfil 2 · Capstone Turbine 2 · Chelsea Group 2 · Cleaver-Brooks 4 · ConDex Energy 2 · Constellation Energy 5 · Control Instruments 2 · CopperTree Analytics 3 · Cushman & Wakefield 2 · Cypress Envirosystems 5 · Doosan Fuel Cell America 3 · DTE Energy Services 2 · Dyson 4 · Eaton 3 · EcoSafe Zero Waste 2 · EDF Renewable Energy 2 · Edison Energy 2 · Energy Management Systems 4 · Energy Source 2 · EnerNOC 2 · Enertech Global 2 · EnterSolar 2 · Environmental Resources Management 2 · ERS International 3 · ETwater Systems 2 · Every Watt Matters 2 · Eye Lighting International 3 · Facility Solutions Group 2 · FacilityConneX 2 · Fellon-McCord & Associates 3 · GDF SUEZ Energy NA 2 · GE Distributed Power 2 · GE Solar 2 · Gexpro 3 · GI Energy 2 · Green Ballast 2 · Greenworks Energy Solutions 3 · Harris Lighting 2 · Heritage Interactive Services 2 · Hurst Boiler & Welding Co. 2 · IBM 4 · ICETEC Energy Services 2 · ICONICS 3 · Invensys Operations Management 2 · JLL 4 · Jorgensen Facilities Services 5 · K+S Services 2 · KDC Solar 2 · KERAMIDA 2 · Knauf Insulation 2 · KVAR Energy Savings 3 · LEDtronics 2 · Lutron Electronics Co. 3 · MaxLite 2 · MCEnergy 2 · MEP Associates 2 · MPC Energy 5 · Munters 2 · Newton Distributing Company 2 · Nortec 3 · North America Power Partners 2 · North American Roofing 2 · OAKLEAF 4 · Optimum Energy 2 · Orion Energy Systems 2 · OSRAM SYLVANIA 5 · Pfister Energy 2 · PowerSecure 5 · Rinnai America 2 · Rockwell Automation 2 · ROXUL 2 · Rubicon Global 2 · SAP America 2 · Schneider Electric 6 · Shaw Environmental & Infrastructure 5 · Sloan 2 · Solar UV Solutions 3 · Solatube International 3 · Steril-Aire 2 · Synergy Investment 6 · The Dow Chemical Company 2 · Thermal Energy International 3 · Trane 2 · Tremco Roofing and Building Maintenance 2 · Viridity Energy 2 · Wahaso - Water Harvesting Solutions 2 · Zurn Industries 2
In writing, from past delegates.
Their words, not ours.
“Every year we are able to find new partners to develop breakthrough projects”
Breitner MarczewskiDirector of Energy Engineering, General MotorsRead the whole quote
“FMA Summit has been a very friendly business event for General Motors. Every year we are able to find new partners to develop breakthrough projects”
“We will be partnering with a couple of the presenters at the Summit”
Read the whole quote
“…The expertise represented at this Summit (solar, lighting, etc.) was impressive and very informative. We will be partnering with a couple of the presenters at the Summit…”
Scott CullenAmericas Environmental Compliance Manager, Bostik“…full of opportunities to network with vendors I was interested in”
Read the whole quote
“I found the experience well organized and full of opportunities to network with vendors I was interested in.”
Warren VoughtCorporate Facilities Manager, Archer Daniels Midland“…so we can learn more about what each company has to offer”
Read the whole quote
“The presenters were very knowledgeable and did a great job of communicating during the one on one time during breaks. I look forward to the site visits so we can learn more about what each company has to offer.”
John ShewmakerFacility Maintenance Manager, Hitachi Automotive SystemsSee 8 moreShow fewer
“I am always skeptical with conferences whether they will be worth my time. This Summit was a very good blend and balance of solutions and testimonials. I will recommend this seminar to others in my company…”
Larry GlaserAVP, Director of Operations Support, OSI Industries“…Enjoyed the Summit and met some good contacts.”
Russ DelozierDirector of Sustainability, J+J Flooring Group“Great Summit to attend and see the diversity of industry and government. Several vendors presented new ideas to problems we all face in the industry.”
Ed HagerstromDirector EHS, Refresco Beverages US Inc.“Excellent set of presenters on a wide range of subjects, lots of new and forward thinking. Great networking with small groups- startup dinners and circulation times.”
John DeVinneySenior Project Manager, Perdue Farms“I’ve been to a lot of conferences and I found the FMA sessions to be excellent, engaging and interesting. I think it had some of the best speakers I’ve ever seen in a conference I’ve been to. I certainly liked the format, the 20 minutes sessions, so you can get the top level ideas or thoughts without having to hear in infinite detail. The format is well structured, the speakers were really, really good and I would highly recommend this conference to anybody in this field.”
Brendan SullivanExecutive Director, Facilities, Estée Lauder“The Summit was truly ‘eye-opening’. I got an excellent sense of momentum building for companies and institutions making significant changes for the future. Woe betide those organizations who turn a blind eye to the need and benefits of changing how they manage and operate their facilities.”
Chris WendtFacilities Manager, Standard Motor Products, Inc.“As a global leader, it’s extremely important for me to stay current on technological advances. The FMA Summit brought current advances and best practices to me in an efficient 1.5 day event”
Maria WatsonSr. Manager Global Energy, Pall Corporation“The FMA Energy and Sustainability Summit provides valuable insight into where leaders in various industries are finding success in systems and processes that drive overall efficiencies and organizational sustainment.”
Brian SkrobarcekCorporate Director of Environmental Affairs, StandardAeroWhat sponsors closed, and what buyers said.
Past sponsors on the business that came from an FMA introduction, and past buyers on the vendors they met there.
Set up Wednesday. Two full days of meetings. Home Friday afternoon.
Same schedule in Columbus and Detroit.
- Wednesday afternoonSponsors set up their exhibits. Everyone checks in.
- ThursdayThe full day: plant case studies, booked 1-on-1s, the reception and dinner.
- FridayMorning case studies, more 1-on-1s, closing lunch. On the road by mid-afternoon.
The hour-by-hour plan and the venues
| Time | Wednesday | Thursday | Friday |
|---|---|---|---|
| 7:00 AM | Breakfast at your company table | Breakfast at your company table | |
| 8:00–10:00 AM | Plant case studies | Plant case studies | |
| 10:00 AM | Coffee and shop talk in the exhibit room | Pre-booked 20-minute 1-on-1s at your table | |
| 11:00 AM | Plant case studies | Plant case studies | |
| 12:00 PM | Lunch with your booked 1-on-1 meetings | Closing lunch with your booked 1-on-1 meetings | |
| 1:00 PM | Plant case studies | Plant case studies, then head home | |
| 2:00 PM | Sponsor setup and check-in | Pre-booked 20-minute 1-on-1s at your table | |
| 3:00 PM | Sponsor setup and check-in | Coffee and shop talk in the exhibit room | |
| 3:30 PM | Sponsor setup and check-in | Plant case studies | |
| 5:00–7:00 PM | Sponsor setup and check-in | Reception and dinner, with more 1-on-1s |
The full package's 15 pre-booked 20-minute 1-on-1s run Thursday and Friday: in the meeting blocks above, at lunch, and at the reception. Each is with a plant leader who asked to meet you, at your company table. You get your meeting schedule before you arrive, and the delegate list, with names, titles and companies, 30 days before the summit.


Venue photos via Wikimedia Commons: Hilton Columbus Downtown by Ɱ (CC BY-SA 4.0); Renaissance Center by Crisco 1492 (public domain).
The program: plant leaders come to hear how other plants fixed it.
The program is built from projects plants actually finished, presented by the plant and the company that did the work. Every industrial refrigeration category has room for more. If you've solved a problem like these, your story belongs on this program.
-
Refrigeration controls and optimizationInvited
Tyson Foods poultry plant, Robards, Kentucky, lowers ammonia compressor discharge pressure
Discharge pressure was cut by 10 psi across all six compressors. Projected savings were 2,217,495 kWh a year; four months of utility bills confirmed an annual savings of 2,100,000 kWh (measured). Tyson then made the same change at plants in Arkansas and Mississippi (as reported by Food Industry Executive).
The problem: Six ammonia refrigeration compressors were running at higher discharge pressure than the load required.
Published result: Discharge pressure was cut by 10 psi across all six compressors. Projected savings were 2,217,495 kWh a year; four months of utility bills confirmed an annual savings of 2,100,000 kWh (measured). Tyson then made the same change at plants in Arkansas and Mississippi (as reported by Food Industry Executive).
Invited: Tyson Foods · Read the published case
-
Heat recovery and heat pumpsInvited
Saputo dairy plant, British Columbia, replaces boilers with a 1.5MW ammonia heat pump
A 1.5MW (426.5TR) Vilter VQ95 ammonia heat pump using refrigeration waste heat is expected to cut the facility's GHG emissions by approximately 40% annually (projected, as reported by Vilter by Copeland at ATMO America 2025).
The problem: The plant burned fuel in boilers for hot water at 18 separate heating points while rejecting heat from its ammonia refrigeration.
Published result: A 1.5MW (426.5TR) Vilter VQ95 ammonia heat pump using refrigeration waste heat is expected to cut the facility's GHG emissions by approximately 40% annually (projected, as reported by Vilter by Copeland at ATMO America 2025).
Invited: Vilter by Copeland, with Saputo · Read the published case
-
Freezing and blast freezingInvited
Smith Frozen Foods cuts freezing and refrigeration energy over 14 projects
14 refrigeration projects since 2014 save nearly 9 million kWh a year; a 2021 freezer tunnel project alone saved 2.3 million kWh, 13% of the company's total savings over 20 years (as reported by Energy Trust of Oregon).
The problem: The frozen food processor has worked through refrigeration and freezer upgrades one project at a time since 2014.
Published result: 14 refrigeration projects since 2014 save nearly 9 million kWh a year; a 2021 freezer tunnel project alone saved 2.3 million kWh, 13% of the company's total savings over 20 years (as reported by Energy Trust of Oregon).
Invited: Smith Frozen Foods · Read the published case
See all 8 stories, in 5 categories, and how a session runs
- 1The problemWhat was happening at the plant.
- 2The costEnergy, maintenance, downtime or lost output.
- 3The decisionThe options they weighed, and why this one.
- 4The workWhat changed, how long it took, what went wrong.
- 5The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
- 6The lessonsWhat another plant should check first.
-
Ammonia and CO2 systems
2 stories invited · 1 open slot-
Invited
Reser's Don Pancho West plant, Salem, Oregon, moves to CO2 refrigeration
The new system is expected to use 41% less electricity than the modeled baseline, with 114% greater refrigeration capacity. With a compressed air project, the plant expects more than 20% lower electricity use, nearly 1.9 million kWh a year (as reported by Food Engineering, from Reser's and Energy Trust of Oregon).
The problem: The new tortilla plant replaced six refrigeration systems that used a higher global warming potential refrigerant.
Published result: The new system is expected to use 41% less electricity than the modeled baseline, with 114% greater refrigeration capacity. With a compressed air project, the plant expects more than 20% lower electricity use, nearly 1.9 million kWh a year (as reported by Food Engineering, from Reser's and Energy Trust of Oregon).
Invited: Reser's Fine Foods · Read the published case
-
Invited
Pilgrim UK meat plant, Bromborough, replaces a 20-year-old cooling system with an ammonia pack
A 707kW BITZER ammonia compressor pack has an estimated running cost of £61,000 a year, over £80,000 a year less, nearly 60% (estimated, as reported by BITZER via Refindustry).
The problem: The plant's 20-year-old cooling system was at the end of its life and cost £146,000 a year to run.
Published result: A 707kW BITZER ammonia compressor pack has an estimated running cost of £61,000 a year, over £80,000 a year less, nearly 60% (estimated, as reported by BITZER via Refindustry).
Invited: BITZER and Demeva Refrigeration, with Pilgrim UK · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Refrigeration controls and optimization
2 stories invited · 1 open slot-
Invited
Tyson Foods poultry plant, Robards, Kentucky, lowers ammonia compressor discharge pressure
Discharge pressure was cut by 10 psi across all six compressors. Projected savings were 2,217,495 kWh a year; four months of utility bills confirmed an annual savings of 2,100,000 kWh (measured). Tyson then made the same change at plants in Arkansas and Mississippi (as reported by Food Industry Executive).
The problem: Six ammonia refrigeration compressors were running at higher discharge pressure than the load required.
Published result: Discharge pressure was cut by 10 psi across all six compressors. Projected savings were 2,217,495 kWh a year; four months of utility bills confirmed an annual savings of 2,100,000 kWh (measured). Tyson then made the same change at plants in Arkansas and Mississippi (as reported by Food Industry Executive).
Invited: Tyson Foods · Read the published case
-
Invited
Large frozen French fry producer runs its refrigeration at the best efficiency point in real time
Actemium's Real-Time Coefficient of Performance software on Rockwell's PlantPAx cut energy use by nearly 17%, nearly US$130,000 annual savings per site (as reported by Rockwell Automation via FoodIngredientsFirst).
The problem: The producer wanted to run its frozen-food refrigeration more efficiently.
Published result: Actemium's Real-Time Coefficient of Performance software on Rockwell's PlantPAx cut energy use by nearly 17%, nearly US$130,000 annual savings per site (as reported by Rockwell Automation via FoodIngredientsFirst).
Invited: Rockwell Automation and Actemium · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Heat recovery and heat pumps
3 stories invited · 1 open slot-
Invited
Saputo dairy plant, British Columbia, replaces boilers with a 1.5MW ammonia heat pump
A 1.5MW (426.5TR) Vilter VQ95 ammonia heat pump using refrigeration waste heat is expected to cut the facility's GHG emissions by approximately 40% annually (projected, as reported by Vilter by Copeland at ATMO America 2025).
The problem: The plant burned fuel in boilers for hot water at 18 separate heating points while rejecting heat from its ammonia refrigeration.
Published result: A 1.5MW (426.5TR) Vilter VQ95 ammonia heat pump using refrigeration waste heat is expected to cut the facility's GHG emissions by approximately 40% annually (projected, as reported by Vilter by Copeland at ATMO America 2025).
Invited: Vilter by Copeland, with Saputo · Read the published case
-
Invited
Nestlé confectionery plant, Halifax, UK, uses an ammonia heat pump instead of coal-fired steam
An ammonia heat pump with Vilter compressors cut process utility costs at the site by over $394,000 per year and CO2 by over 1.1 million pounds per year. The system was commissioned in May 2010 (as reported by Vilter by Copeland).
The problem: The chocolate plant needs both cooling and heat and ran on a central coal-fired steam plant.
Published result: An ammonia heat pump with Vilter compressors cut process utility costs at the site by over $394,000 per year and CO2 by over 1.1 million pounds per year. The system was commissioned in May 2010 (as reported by Vilter by Copeland).
Invited: Vilter by Copeland and Star Refrigeration, with Nestlé · Read the published case
-
Invited
Conestoga Meats pork plant, Breslau, Ontario, heats wash water with refrigeration heat
An ammonia heat pump preheats water from 55°F to 100°F: annual energy savings of 3,374 MWh, 3,000 metric tons of CO2 a year, 3,107K gallons of water a year, payback in less than 3 years against a projected 3.5 years (as reported by Vilter by Copeland).
The problem: The pork plant needed more refrigeration capacity and a lot of hot water for clean-in-place and washup.
Published result: An ammonia heat pump preheats water from 55°F to 100°F: annual energy savings of 3,374 MWh, 3,000 metric tons of CO2 a year, 3,107K gallons of water a year, payback in less than 3 years against a projected 3.5 years (as reported by Vilter by Copeland).
Invited: Vilter by Copeland and SCS Refrigeration, with Conestoga Meats · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Safety, service and PSM compliance
Open: no story invited yet -
Freezing and blast freezing
1 story invited · 1 open slot-
Invited
Smith Frozen Foods cuts freezing and refrigeration energy over 14 projects
14 refrigeration projects since 2014 save nearly 9 million kWh a year; a 2021 freezer tunnel project alone saved 2.3 million kWh, 13% of the company's total savings over 20 years (as reported by Energy Trust of Oregon).
The problem: The frozen food processor has worked through refrigeration and freezer upgrades one project at a time since 2014.
Published result: 14 refrigeration projects since 2014 save nearly 9 million kWh a year; a 2021 freezer tunnel project alone saved 2.3 million kWh, 13% of the company's total savings over 20 years (as reported by Energy Trust of Oregon).
Invited: Smith Frozen Foods · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
"Invited" means invited: none of these companies has confirmed. Results are as published by the supplier; we ask every presenter for dates, baseline costs and verified results before the program is final.





Real FMA Summit rooms. No stock photography.
Get in front of the decision makers, not the crowd.
Full package
- 15 guaranteed pre-scheduled meetings
- A 20-minute case-study session
- A fully furnished exhibit
- Your corporate dining table
- Three people at full access
Add meetings up to 40 at $1,500 each.
- Any booked meeting that doesn’t happen is added to your next summit, written into your sponsor agreement.
- Each summit is capped at 20 sponsors, each solving a different problem for the people in the room.
Want the category to yourself? Each summit is capped at 20 sponsors. To talk about your category, .
- Plant leaders ask to meet you. We seat the ones who asked at your table.
- Your booked meeting schedule arrives before the summit.
- Any booked meeting that doesn't happen is added to your next summit: miss 3, and you get 15 plus 3. It's written into your sponsor agreement.
- You get the delegate list 30 days before the summit: names, titles and companies.
- Three people are included with full access. Extra passes are $2,900 each.
Or pick only what you wantMeetings from $15,000, talk $15,000, exhibit $15,000, dining table $10,000
One category, one summit. Prices in USD. Whatever you pick includes three people with full access. Meetings are booked on an opt-in basis before the summit; any booked meeting that doesn't happen is added to your next summit.
No vendor walks the show. Solution providers attend only as sponsors. A vendor that has not sponsored cannot register, attend or work the room, so the plant leaders you meet are not being chased by your competitors in the hallway.
The ten questions every sponsor asks.
Past sponsors answer all ten in one 5-minute film. Pick a question and the film jumps to its answer.
Now ask your own questions.
Answered on camera by past FMA sponsors. Recorded at past FMA summits.
Who's behind it.


Started FMA in Montreal in 2007 and has run every summit himself: 35 of them, 17,000+ meetings. Capped at 20 sponsors per summit, meetings booked before anyone arrives, and no vendor walks the show.
Read the full story





Industrial refrigeration sponsors were in 2 of the 35 summits. Every sponsor and speaker, as printed.
Open any programCapped at 20 sponsors per summit, each solving a different problem for the plants in the room.
Twenty minutes with Joe Piazza: who is coming to your summit, where your company fits among its 20 sponsors, and what the agreement says. The sponsor brief has the delegate profile, the full agenda and the itemized pricing.
35 summits since 2007. Joe Piazza, who founded FMA, runs every summit himself. The videos on this page are from past summits.