Executive Summits · by the Future of Manufacturing Alliance
MRO & Industrial Supply Summit for Manufacturing Plants
Meet the plant leaders whose line is down for a $40 part nobody can find.
Each summit is capped at 20 sponsors. Talk to Joe before it fills.
Who’s coming so far
21 manufacturers have confirmed they will send people. The target is 100+ plant leaders in the room by each summit.
- Honda
- GE Aerospace
- General Motors
- Stellantis / Jeep
- Procter & Gamble
- Cleveland-Cliffs
- Whirlpool
- Goodyear Tire & Rubber
- Parker Hannifin
- Swagelok
- Crown Equipment
- Lincoln Electric
- Sherwin-Williams
- + 8 very large manufacturers, not named at their request
Two days with maintenance, storeroom, purchasing and plant leaders from Midwest manufacturers cutting stockouts, spare-parts cost and the time crews spend hunting for parts. Pre-scheduled 1-on-1 meetings. No expo hall.
The people who sign the PO for MRO projects.
Invited from plants across Ohio, Michigan, Indiana, Pennsylvania and Kentucky. Every delegate is screened by title and plant.

1,470plant leaders from 495 manufacturers have come to past FMA summits.1,033 of them pick the vendor, own the budget or sign off.
Who decides a plant purchase, and how many came
- Step 1287Find the problem, write the specEnergy Engineer, Facilities Engineer, Environmental Engineer
- Step 2560Pick the vendorFacilities Manager, Environmental Manager, Energy Manager
- Step 3337Own the budgetDirector of Engineering, Director of Operations, Director of Manufacturing
- Step 4136Sign offPlant Manager, General Manager, President
Who we invite to this summit
Each title, and what that person owns.
- Maintenance ManagerNeeds the part now
- Storeroom / MRO ManagerStock, kitting, vending
- Purchasing & Sourcing ManagerSupplier consolidation
- Plant ManagerUptime and working capital
- Reliability EngineerCritical spares
Where past delegates worked
Plant leaders at past FMA summits, by industry.
Industries we are inviting to this summit: Automotive and parts (Ohio, Michigan, Indiana) · Metals and fabrication (tooling, abrasives, bearings) · Food and beverage (food-grade spares, washdown) · Chemicals and materials (pumps, seals, valves) · Multi-plant manufacturers (standardizing suppliers).
Counts are past FMA delegates, each counted once. They show who this audience is; they are not 2027 attendees.
Past speakers and delegates, by industry
Food and beverage
12 speakers · 161 delegates






Automotive
10 speakers · 192 delegates






Machinery, equipment and electronics
7 speakers · 209 delegates






Chemicals, plastics and rubber
6 speakers · 120 delegates






Steel and metals
2 speakers · 82 delegates






Aerospace, pharma, building and consumer products
29 speakers · 667 delegates






They came back.
Past FMA sponsors, and how many summits each one sponsored, from the printed programs.
- 2K+S ServicesMRO and industrial supply · 2 summits
- 18US LED18 summits
- 17Kaeser Compressors17 summits
- 14Covanta14 summits
- 14Solution Dynamics14 summits
- 10Advanced Power Technologies10 summits
- 8Smardt Chiller Group8 summits
- 7BASF7 summits
- 7EQUIDEX Energy7 summits
- 7LG Electronics7 summits
- 6AgriPower6 summits
- 6Greenstar Recycling6 summits
See the other 102 companies that sponsored two or more FMA summits
3M 2 · Acuity Brands 4 · Advanced Green Technologies 3 · Advantix Systems 8 · AERCO International 5 · Air Balance 2 · AmbiRad 3 · Ameresco 2 · Armstrong Fluid Technology 5 · Badger Meter 2 · Be Power Tech 2 · Bio-Reaction Industries 2 · BLUEFIN 4 · Bosch Thermotechnology 2 · Burns & McDonnell Engineering 3 · Camfil 2 · Capstone Turbine 2 · Chelsea Group 2 · Cleaver-Brooks 4 · ConDex Energy 2 · Constellation Energy 5 · Control Instruments 2 · CopperTree Analytics 3 · Cushman & Wakefield 2 · Cypress Envirosystems 5 · Doosan Fuel Cell America 3 · DTE Energy Services 2 · Dyson 4 · Eaton 3 · EcoSafe Zero Waste 2 · EDF Renewable Energy 2 · Edison Energy 2 · Emerson Climate Technologies 2 · Energy Management Systems 4 · Energy Source 2 · EnerNOC 2 · Enertech Global 2 · EnterSolar 2 · Environmental Resources Management 2 · ERS International 3 · ETwater Systems 2 · Every Watt Matters 2 · Eye Lighting International 3 · Facility Solutions Group 2 · FacilityConneX 2 · Fellon-McCord & Associates 3 · GDF SUEZ Energy NA 2 · GE Distributed Power 2 · GE Solar 2 · Gexpro 3 · GI Energy 2 · Green Ballast 2 · Greenworks Energy Solutions 3 · Harris Lighting 2 · Heritage Interactive Services 2 · Hurst Boiler & Welding Co. 2 · IBM 4 · ICETEC Energy Services 2 · ICONICS 3 · Invensys Operations Management 2 · JLL 4 · Jorgensen Facilities Services 5 · KDC Solar 2 · KERAMIDA 2 · Knauf Insulation 2 · KVAR Energy Savings 3 · LEDtronics 2 · Lutron Electronics Co. 3 · MaxLite 2 · MCEnergy 2 · MEP Associates 2 · MPC Energy 5 · Munters 2 · Newton Distributing Company 2 · Nortec 3 · North America Power Partners 2 · North American Roofing 2 · OAKLEAF 4 · Optimum Energy 2 · Orion Energy Systems 2 · OSRAM SYLVANIA 5 · Pfister Energy 2 · PowerSecure 5 · Rinnai America 2 · Rockwell Automation 2 · ROXUL 2 · Rubicon Global 2 · SAP America 2 · Schneider Electric 6 · Shaw Environmental & Infrastructure 5 · Sloan 2 · Solar UV Solutions 3 · Solatube International 3 · Steril-Aire 2 · Synergy Investment 6 · The Dow Chemical Company 2 · Thermal Energy International 3 · Trane 2 · Tremco Roofing and Building Maintenance 2 · Viridity Energy 2 · Wahaso - Water Harvesting Solutions 2 · Zurn Industries 2
In writing, from past delegates.
Their words, not ours.
“Every year we are able to find new partners to develop breakthrough projects”
Breitner MarczewskiDirector of Energy Engineering, General MotorsRead the whole quote
“FMA Summit has been a very friendly business event for General Motors. Every year we are able to find new partners to develop breakthrough projects”
“We will be partnering with a couple of the presenters at the Summit”
Read the whole quote
“…The expertise represented at this Summit (solar, lighting, etc.) was impressive and very informative. We will be partnering with a couple of the presenters at the Summit…”
Scott CullenAmericas Environmental Compliance Manager, Bostik“…full of opportunities to network with vendors I was interested in”
Read the whole quote
“I found the experience well organized and full of opportunities to network with vendors I was interested in.”
Warren VoughtCorporate Facilities Manager, Archer Daniels Midland“…FMA is an extremely flexible, and very accommodating group. It’s been outstanding after I gave my presentation, the enthusiasm of the people, the questions continue even now, people wanting to know more details. It’s that sharing between people and myself. I’ve learned a lot myself so that’s been a great aspect of being here. The people that have come and I had interaction with have been the right kind of people I want to talk to.”
Kevin ButtGeneral Manager and Chief Environmental Officer, Toyota Motor Engineering & Manufacturing North America, Inc.See 8 moreShow fewer
“The presenters were very knowledgeable and did a great job of communicating during the one on one time during breaks. I look forward to the site visits so we can learn more about what each company has to offer.”
John ShewmakerFacility Maintenance Manager, Hitachi Automotive Systems“Very well organized! Great topics and great speakers. Spoke to vendors regarding current initiatives and met vendors regarding their initiatives and how they can provide guidance and services to UniFirst…”
Carrie BertolinoEnergy Analyst, UniFirst Corporation“I am always skeptical with conferences whether they will be worth my time. This Summit was a very good blend and balance of solutions and testimonials. I will recommend this seminar to others in my company…”
Larry GlaserAVP, Director of Operations Support, OSI Industries“…We enjoyed attending your event and definitely appreciated presenting our LEED gold plant and our sustainability programs. … We definitely learned some things as well.”
Gregory ClarkDirector of Construction & Facilities Management, White Castle Management Co.“First time here, was impressed by many of the presenters and the issues they brought up and their solutions.”
Steven JonesElectrical Engineer, ITW Hi-Cone“First time Summit attendee. Great introduction to a number of topics important to Facility Managers of the Future.”
Alec BartolaiSustainability Program Manager, Sargento Foods, Inc.“I feel that a Summit like this adds to the tools needed to elevate my abilities and my company, to enable a better building/company.”
Reed GibsonFacilities Manager, Pall Corporation“I very much enjoyed participating in the summit…”
Kurtis JetselDirector - Facilities/ESH, Lockheed MartinWhat sponsors closed, and what buyers said.
Past sponsors on the business that came from an FMA introduction, and past buyers on the vendors they met there.
Set up Wednesday. Two full days of meetings. Home Friday afternoon.
Same schedule in Columbus and Detroit.
- Wednesday afternoonSponsors set up their exhibits. Everyone checks in.
- ThursdayThe full day: plant case studies, booked 1-on-1s, the reception and dinner.
- FridayMorning case studies, more 1-on-1s, closing lunch. On the road by mid-afternoon.
The hour-by-hour plan and the venues
| Time | Wednesday | Thursday | Friday |
|---|---|---|---|
| 7:00 AM | Breakfast at your company table | Breakfast at your company table | |
| 8:00–10:00 AM | Plant case studies | Plant case studies | |
| 10:00 AM | Coffee and shop talk in the exhibit room | Pre-booked 20-minute 1-on-1s at your table | |
| 11:00 AM | Plant case studies | Plant case studies | |
| 12:00 PM | Lunch with your booked 1-on-1 meetings | Closing lunch with your booked 1-on-1 meetings | |
| 1:00 PM | Plant case studies | Plant case studies, then head home | |
| 2:00 PM | Sponsor setup and check-in | Pre-booked 20-minute 1-on-1s at your table | |
| 3:00 PM | Sponsor setup and check-in | Coffee and shop talk in the exhibit room | |
| 3:30 PM | Sponsor setup and check-in | Plant case studies | |
| 5:00–7:00 PM | Sponsor setup and check-in | Reception and dinner, with more 1-on-1s |
The full package's 15 pre-booked 20-minute 1-on-1s run Thursday and Friday: in the meeting blocks above, at lunch, and at the reception. Each is with a plant leader who asked to meet you, at your company table. You get your meeting schedule before you arrive, and the delegate list, with names, titles and companies, 30 days before the summit.


Venue photos via Wikimedia Commons: Hilton Columbus Downtown by Ɱ (CC BY-SA 4.0); Renaissance Center by Crisco 1492 (public domain).
The program: plant leaders come to hear how other plants fixed it.
The program is built from projects plants actually finished, presented by the plant and the company that did the work. Every MRO and industrial supply category has room for more. If you've solved a problem like these, your story belongs on this program.
-
MRO distributorsInvited
How Bettcher Industries in Ohio brought its CNC tooling under control
Fastenal point-of-use tooling and an onsite team, with a fluid program from Fluid Service Technologies: the tool crib went from a first-shift attendant plus half-time attendants on second and third shifts to one first-shift employee spending 50 to 75% of his time on tooling, and cutting fluids went from six to two; hard cost savings were reported but not quantified (as reported by Fastenal; period not stated).
The problem: With 44 CNC machines running three shifts, Bettcher needed control and visibility of its metalworking tooling, and not every tool was stocked where it was needed.
Published result: Fastenal point-of-use tooling and an onsite team, with a fluid program from Fluid Service Technologies: the tool crib went from a first-shift attendant plus half-time attendants on second and third shifts to one first-shift employee spending 50 to 75% of his time on tooling, and cutting fluids went from six to two; hard cost savings were reported but not quantified (as reported by Fastenal; period not stated).
Invited: Fastenal and Fluid Service Technologies, with Bettcher Industries · Read the published case
-
Spare parts and obsolescenceInvited
How Nestle USA made spare parts findable across its factories
SPARETECH's AI search tool integrated with SAP: parts found about 50% faster in time testing, and monthly use of the tool above 95% (as reported by Plant Services from the Nestle USA and SPARETECH SMRP 2025 presentation).
The problem: Parts were catalogued by plant-specific SAP numbers, so the same part sat in many factories under different numbers, and stock built up during COVID was never brought back down.
Published result: SPARETECH's AI search tool integrated with SAP: parts found about 50% faster in time testing, and monthly use of the tool above 95% (as reported by Plant Services from the Nestle USA and SPARETECH SMRP 2025 presentation).
Invited: SPARETECH, with Nestle USA · Read the published case
-
Integrated supply and storeroomsInvited
Proving an outsourced storeroom's worth: $4 million at a packaging manufacturer
More than $4 million in total material savings (nearly $560,000 a year for seven years), more than $200,000 a year from inventory reduction over eight years, $1.5 million from a min/max refresh and 100% on-time delivery for six consecutive months in 2023; the client renewed for two more three-year terms (as reported by RS Integrated Supply; customer not named).
The problem: After seven years, a new manager questioned the value of the outsourced MRO storeroom and proposed bringing it back in-house.
Published result: More than $4 million in total material savings (nearly $560,000 a year for seven years), more than $200,000 a year from inventory reduction over eight years, $1.5 million from a min/max refresh and 100% on-time delivery for six consecutive months in 2023; the client renewed for two more three-year terms (as reported by RS Integrated Supply; customer not named).
Invited: RS Integrated Supply · Read the published case
See all 10 stories, in 4 categories, and how a session runs
- 1The problemWhat was happening at the plant.
- 2The costEnergy, maintenance, downtime or lost output.
- 3The decisionThe options they weighed, and why this one.
- 4The workWhat changed, how long it took, what went wrong.
- 5The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
- 6The lessonsWhat another plant should check first.
-
MRO distributors
2 stories invited · 1 open slot-
Invited
How Bettcher Industries in Ohio brought its CNC tooling under control
Fastenal point-of-use tooling and an onsite team, with a fluid program from Fluid Service Technologies: the tool crib went from a first-shift attendant plus half-time attendants on second and third shifts to one first-shift employee spending 50 to 75% of his time on tooling, and cutting fluids went from six to two; hard cost savings were reported but not quantified (as reported by Fastenal; period not stated).
The problem: With 44 CNC machines running three shifts, Bettcher needed control and visibility of its metalworking tooling, and not every tool was stocked where it was needed.
Published result: Fastenal point-of-use tooling and an onsite team, with a fluid program from Fluid Service Technologies: the tool crib went from a first-shift attendant plus half-time attendants on second and third shifts to one first-shift employee spending 50 to 75% of his time on tooling, and cutting fluids went from six to two; hard cost savings were reported but not quantified (as reported by Fastenal; period not stated).
Invited: Fastenal and Fluid Service Technologies, with Bettcher Industries · Read the published case
-
Invited
How Catamount Machine Works near Tampa, Florida cut $350K of tool inventory
MSC vending, vendor-managed inventory, a tool crib conversion and metalworking specialists: throughput up 42%, revenues up 47%, production time cut by up to 81% by moving to carbide, labor costs down $60K annually, tool inventory down $350K and tool spend down $75K annually (as reported by MSC Industrial Supply; period not stated for the percentages).
The problem: An outdated, disorganized tool crib and manual inventory wasted labor time, gave poor data and caused both overstock and stockouts.
Published result: MSC vending, vendor-managed inventory, a tool crib conversion and metalworking specialists: throughput up 42%, revenues up 47%, production time cut by up to 81% by moving to carbide, labor costs down $60K annually, tool inventory down $350K and tool spend down $75K annually (as reported by MSC Industrial Supply; period not stated for the percentages).
Invited: MSC Industrial Supply, with Catamount Machine Works · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Onsite and vending programs
3 stories invited · 1 open slot-
Invited
Bringing supply onsite at Pilgrim's poultry complex in Moorefield, West Virginia
A Fastenal onsite program with staffing and daily on-premises service centralized inventory and streamlined replenishment; the study reports reduced excess inventory, greater supply reliability and a simpler internal workload, with no figures given (as reported by Fastenal).
The problem: The remote plant kept a six-week PPE buffer that filled an entire room, made frequent 50-mile restocking trips and ordered by hand from many suppliers.
Published result: A Fastenal onsite program with staffing and daily on-premises service centralized inventory and streamlined replenishment; the study reports reduced excess inventory, greater supply reliability and a simpler internal workload, with no figures given (as reported by Fastenal).
Invited: Fastenal, with Pilgrim's Moorefield · Read the published case
-
Invited
How a multi-site food processor cut its MRO suppliers from 400 to 72
Three dedicated Fastenal onsite employees with vending and VMI: 27% total cost of ownership savings, 7-10% hard cost savings, suppliers cut from 400 to 72 and inventory reduced from 6 weeks to 4 (as reported by Fastenal; customer not named; period not stated).
The problem: PPE and MRO supplies across a hatchery, truck shop and feed mill meant 5-6 weeks of stock, tight space, inconsistent shipments and billing, and staff time lost to managing supply.
Published result: Three dedicated Fastenal onsite employees with vending and VMI: 27% total cost of ownership savings, 7-10% hard cost savings, suppliers cut from 400 to 72 and inventory reduced from 6 weeks to 4 (as reported by Fastenal; customer not named; period not stated).
Invited: Fastenal · Read the published case
-
Invited
How a poultry processor freed 40 hours a week with an onsite crib
A Fastenal onsite crib with a dedicated team, point-of-use locations and daily replenishment: 40 hours a week freed for core operations, 10-15% hard cost savings and suppliers cut from 10 to 1 (as reported by Fastenal; customer not named; period not stated).
The problem: High turnover of PPE and MRO items, risk of outages, no traceability of consumption and excess inventory tying up resources.
Published result: A Fastenal onsite crib with a dedicated team, point-of-use locations and daily replenishment: 40 hours a week freed for core operations, 10-15% hard cost savings and suppliers cut from 10 to 1 (as reported by Fastenal; customer not named; period not stated).
Invited: Fastenal · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Integrated supply and storerooms
3 stories invited · 1 open slot-
Invited
Proving an outsourced storeroom's worth: $4 million at a packaging manufacturer
More than $4 million in total material savings (nearly $560,000 a year for seven years), more than $200,000 a year from inventory reduction over eight years, $1.5 million from a min/max refresh and 100% on-time delivery for six consecutive months in 2023; the client renewed for two more three-year terms (as reported by RS Integrated Supply; customer not named).
The problem: After seven years, a new manager questioned the value of the outsourced MRO storeroom and proposed bringing it back in-house.
Published result: More than $4 million in total material savings (nearly $560,000 a year for seven years), more than $200,000 a year from inventory reduction over eight years, $1.5 million from a min/max refresh and 100% on-time delivery for six consecutive months in 2023; the client renewed for two more three-year terms (as reported by RS Integrated Supply; customer not named).
Invited: RS Integrated Supply · Read the published case
-
Invited
How a health and beauty manufacturer raised storeroom accuracy from 65% to 95%
$3 million in savings, overall spend down more than 22% over an engagement of more than five years (more than 6% a year), and inventory accuracy up from 65% to 95%, with the target reached within three years (as reported by RS Integrated Supply; customer not named).
The problem: The multi-plant site had no standard MRO process, no view of what was needed versus bought, and inventory accuracy well below best practice.
Published result: $3 million in savings, overall spend down more than 22% over an engagement of more than five years (more than 6% a year), and inventory accuracy up from 65% to 95%, with the target reached within three years (as reported by RS Integrated Supply; customer not named).
Invited: RS Integrated Supply · Read the published case
-
Invited
Untangling scattered stockrooms at a large US transport manufacturer
Over six months more than 19,000 SKUs worth more than $15 million were identified and organized; three years in, savings were nearly $1 million and the program had spread to two more sites, with five more planned (as reported by RS Integrated Supply; customer not named).
The problem: Each department ran its own stockroom with no view of inventory value or location, fill rates were unknown and parts deteriorated in sealed containers, delaying production.
Published result: Over six months more than 19,000 SKUs worth more than $15 million were identified and organized; three years in, savings were nearly $1 million and the program had spread to two more sites, with five more planned (as reported by RS Integrated Supply; customer not named).
Invited: RS Integrated Supply · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Spare parts and obsolescence
2 stories invited · 1 open slot-
Invited
How Nestle USA made spare parts findable across its factories
SPARETECH's AI search tool integrated with SAP: parts found about 50% faster in time testing, and monthly use of the tool above 95% (as reported by Plant Services from the Nestle USA and SPARETECH SMRP 2025 presentation).
The problem: Parts were catalogued by plant-specific SAP numbers, so the same part sat in many factories under different numbers, and stock built up during COVID was never brought back down.
Published result: SPARETECH's AI search tool integrated with SAP: parts found about 50% faster in time testing, and monthly use of the tool above 95% (as reported by Plant Services from the Nestle USA and SPARETECH SMRP 2025 presentation).
Invited: SPARETECH, with Nestle USA · Read the published case
-
Invited
How Idahoan Foods in Idaho Falls cleared $500,000 of obsolete spare parts
SPARETECH's spare parts data platform, in the first year of a partnership that began in 2024: $3 million worth of unused inventory identified (over a 3.5-year period), $500,000 eliminated in obsolete parts and a 50% inventory reduction of common parts (as reported by SPARETECH).
The problem: Duplicate and inconsistently named parts, high spares stock at a remote site and nearly 50% of inventory not turned in three years, partly left over from removed equipment.
Published result: SPARETECH's spare parts data platform, in the first year of a partnership that began in 2024: $3 million worth of unused inventory identified (over a 3.5-year period), $500,000 eliminated in obsolete parts and a 50% inventory reduction of common parts (as reported by SPARETECH).
Invited: SPARETECH, with Idahoan Foods · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
"Invited" means invited: none of these companies has confirmed. Results are as published by the supplier; we ask every presenter for dates, baseline costs and verified results before the program is final.





Real FMA Summit rooms. No stock photography.
Get in front of the decision makers, not the crowd.
Full package
- 15 guaranteed pre-scheduled meetings
- A 20-minute case-study session
- A fully furnished exhibit
- Your corporate dining table
- Three people at full access
Add meetings up to 40 at $1,500 each.
- Any booked meeting that doesn’t happen is added to your next summit, written into your sponsor agreement.
- Each summit is capped at 20 sponsors, each solving a different problem for the people in the room.
Want the category to yourself? Each summit is capped at 20 sponsors. To talk about your category, .
- Plant leaders ask to meet you. We seat the ones who asked at your table.
- Your booked meeting schedule arrives before the summit.
- Any booked meeting that doesn't happen is added to your next summit: miss 3, and you get 15 plus 3. It's written into your sponsor agreement.
- You get the delegate list 30 days before the summit: names, titles and companies.
- Three people are included with full access. Extra passes are $2,900 each.
Or pick only what you wantMeetings from $15,000, talk $15,000, exhibit $15,000, dining table $10,000
One category, one summit. Prices in USD. Whatever you pick includes three people with full access. Meetings are booked on an opt-in basis before the summit; any booked meeting that doesn't happen is added to your next summit.
No vendor walks the show. Solution providers attend only as sponsors. A vendor that has not sponsored cannot register, attend or work the room, so the plant leaders you meet are not being chased by your competitors in the hallway.
The ten questions every sponsor asks.
Past sponsors answer all ten in one 5-minute film. Pick a question and the film jumps to its answer.
Now ask your own questions.
Answered on camera by past FMA sponsors. Recorded at past FMA summits.
Who's behind it.


Started FMA in Montreal in 2007 and has run every summit himself: 35 of them, 17,000+ meetings. Capped at 20 sponsors per summit, meetings booked before anyone arrives, and no vendor walks the show.
Read the full story





MRO and industrial supply sponsors were in 2 of the 35 summits. Every sponsor and speaker, as printed.
Open any programCapped at 20 sponsors per summit. The plants that buy every day are in one room.
Twenty minutes with Joe Piazza: who is coming to your summit, where your company fits among its 20 sponsors, and what the agreement says. The sponsor brief has the delegate profile, the full agenda and the itemized pricing.
35 summits since 2007. Joe Piazza, who founded FMA, runs every summit himself. The videos on this page are from past summits.