Executive Summits · by the Future of Manufacturing Alliance
Skilled Trades Staffing & Training Summit for Manufacturing Plants
Meet the plant leaders with open maintenance jobs and no one to fill them.
New category for 2027. Same plant leaders who came to 35 summits.
Each summit is capped at 20 sponsors. Talk to Joe before it fills.
Who’s coming so far
21 manufacturers have confirmed they will send people. The target is 100+ plant leaders in the room by each summit.
- Honda
- GE Aerospace
- General Motors
- Stellantis / Jeep
- Procter & Gamble
- Cleveland-Cliffs
- Whirlpool
- Goodyear Tire & Rubber
- Parker Hannifin
- Swagelok
- Crown Equipment
- Lincoln Electric
- Sherwin-Williams
- + 8 very large manufacturers, not named at their request
Two days with plant managers, maintenance leaders, HR and training managers from Midwest manufacturers short of electricians, millwrights and technicians. Pre-scheduled 1-on-1 meetings. No expo hall.
The people who sign the PO for skilled-trades projects.
Invited from plants across Ohio, Michigan, Indiana, Pennsylvania and Kentucky. Every delegate is screened by title and plant.

1,470plant leaders from 495 manufacturers have come to past FMA summits.1,033 of them pick the vendor, own the budget or sign off.
Who decides a plant purchase, and how many came
- Step 1287Find the problem, write the specEnergy Engineer, Facilities Engineer, Environmental Engineer
- Step 2560Pick the vendorFacilities Manager, Environmental Manager, Energy Manager
- Step 3337Own the budgetDirector of Engineering, Director of Operations, Director of Manufacturing
- Step 4136Sign offPlant Manager, General Manager, President
Who we invite to this summit
Each title, and what that person owns.
- Plant ManagerShort-staffed shifts
- Maintenance ManagerOpen technician jobs
- HR / Talent ManagerHiring and retention
- Training ManagerSkills and apprenticeships
- Operations DirectorOvertime and output
Where past delegates worked
Plant leaders at past FMA summits, by industry.
Industries we are inviting to this summit: Automotive and parts (Ohio, Michigan, Indiana) · Metals and fabrication (welders, machinists) · Food and beverage (maintenance techs, 24/7) · Plastics and rubber (process technicians) · Industrial machinery (assemblers, electricians).
Counts are past FMA delegates, each counted once. They show who this audience is; they are not 2027 attendees.
Past speakers and delegates, by industry
Food and beverage
12 speakers · 161 delegates






Automotive
10 speakers · 192 delegates






Machinery, equipment and electronics
7 speakers · 209 delegates






Chemicals, plastics and rubber
6 speakers · 120 delegates






Steel and metals
2 speakers · 82 delegates






Aerospace, pharma, building and consumer products
29 speakers · 667 delegates






They came back.
Past FMA sponsors, and how many summits each one sponsored, from the printed programs.
- 18US LED18 summits
- 17Kaeser Compressors17 summits
- 14Covanta14 summits
- 14Solution Dynamics14 summits
- 10Advanced Power Technologies10 summits
- 8Smardt Chiller Group8 summits
- 7BASF7 summits
- 7EQUIDEX Energy7 summits
- 7LG Electronics7 summits
- 6AgriPower6 summits
- 6Greenstar Recycling6 summits
- 6Schneider Electric6 summits
See the other 102 companies that sponsored two or more FMA summits
3M 2 · Acuity Brands 4 · Advanced Green Technologies 3 · Advantix Systems 8 · AERCO International 5 · Air Balance 2 · AmbiRad 3 · Ameresco 2 · Armstrong Fluid Technology 5 · Badger Meter 2 · Be Power Tech 2 · Bio-Reaction Industries 2 · BLUEFIN 4 · Bosch Thermotechnology 2 · Burns & McDonnell Engineering 3 · Camfil 2 · Capstone Turbine 2 · Chelsea Group 2 · Cleaver-Brooks 4 · ConDex Energy 2 · Constellation Energy 5 · Control Instruments 2 · CopperTree Analytics 3 · Cushman & Wakefield 2 · Cypress Envirosystems 5 · Doosan Fuel Cell America 3 · DTE Energy Services 2 · Dyson 4 · Eaton 3 · EcoSafe Zero Waste 2 · EDF Renewable Energy 2 · Edison Energy 2 · Emerson Climate Technologies 2 · Energy Management Systems 4 · Energy Source 2 · EnerNOC 2 · Enertech Global 2 · EnterSolar 2 · Environmental Resources Management 2 · ERS International 3 · ETwater Systems 2 · Every Watt Matters 2 · Eye Lighting International 3 · Facility Solutions Group 2 · FacilityConneX 2 · Fellon-McCord & Associates 3 · GDF SUEZ Energy NA 2 · GE Distributed Power 2 · GE Solar 2 · Gexpro 3 · GI Energy 2 · Green Ballast 2 · Greenworks Energy Solutions 3 · Harris Lighting 2 · Heritage Interactive Services 2 · Hurst Boiler & Welding Co. 2 · IBM 4 · ICETEC Energy Services 2 · ICONICS 3 · Invensys Operations Management 2 · JLL 4 · Jorgensen Facilities Services 5 · K+S Services 2 · KDC Solar 2 · KERAMIDA 2 · Knauf Insulation 2 · KVAR Energy Savings 3 · LEDtronics 2 · Lutron Electronics Co. 3 · MaxLite 2 · MCEnergy 2 · MEP Associates 2 · MPC Energy 5 · Munters 2 · Newton Distributing Company 2 · Nortec 3 · North America Power Partners 2 · North American Roofing 2 · OAKLEAF 4 · Optimum Energy 2 · Orion Energy Systems 2 · OSRAM SYLVANIA 5 · Pfister Energy 2 · PowerSecure 5 · Rinnai America 2 · Rockwell Automation 2 · ROXUL 2 · Rubicon Global 2 · SAP America 2 · Shaw Environmental & Infrastructure 5 · Sloan 2 · Solar UV Solutions 3 · Solatube International 3 · Steril-Aire 2 · Synergy Investment 6 · The Dow Chemical Company 2 · Thermal Energy International 3 · Trane 2 · Tremco Roofing and Building Maintenance 2 · Viridity Energy 2 · Wahaso - Water Harvesting Solutions 2 · Zurn Industries 2
In writing, from past delegates.
Their words, not ours.
“Every year we are able to find new partners to develop breakthrough projects”
Breitner MarczewskiDirector of Energy Engineering, General MotorsRead the whole quote
“FMA Summit has been a very friendly business event for General Motors. Every year we are able to find new partners to develop breakthrough projects”
“We will be partnering with a couple of the presenters at the Summit”
Read the whole quote
“…The expertise represented at this Summit (solar, lighting, etc.) was impressive and very informative. We will be partnering with a couple of the presenters at the Summit…”
Scott CullenAmericas Environmental Compliance Manager, Bostik“…full of opportunities to network with vendors I was interested in”
Read the whole quote
“I found the experience well organized and full of opportunities to network with vendors I was interested in.”
Warren VoughtCorporate Facilities Manager, Archer Daniels Midland“Great Summit to attend and see the diversity of industry and government. Several vendors presented new ideas to problems we all face in the industry.”
Ed HagerstromDirector EHS, Refresco Beverages US Inc.See 8 moreShow fewer
“Excellent set of presenters on a wide range of subjects, lots of new and forward thinking. Great networking with small groups- startup dinners and circulation times.”
John DeVinneySenior Project Manager, Perdue Farms“I’ve been to a lot of conferences and I found the FMA sessions to be excellent, engaging and interesting. I think it had some of the best speakers I’ve ever seen in a conference I’ve been to. I certainly liked the format, the 20 minutes sessions, so you can get the top level ideas or thoughts without having to hear in infinite detail. The format is well structured, the speakers were really, really good and I would highly recommend this conference to anybody in this field.”
Brendan SullivanExecutive Director, Facilities, Estée Lauder“The Summit was truly ‘eye-opening’. I got an excellent sense of momentum building for companies and institutions making significant changes for the future. Woe betide those organizations who turn a blind eye to the need and benefits of changing how they manage and operate their facilities.”
Chris WendtFacilities Manager, Standard Motor Products, Inc.“As a global leader, it’s extremely important for me to stay current on technological advances. The FMA Summit brought current advances and best practices to me in an efficient 1.5 day event”
Maria WatsonSr. Manager Global Energy, Pall Corporation“The FMA Energy and Sustainability Summit provides valuable insight into where leaders in various industries are finding success in systems and processes that drive overall efficiencies and organizational sustainment.”
Brian SkrobarcekCorporate Director of Environmental Affairs, StandardAero“First time here, was impressed by many of the presenters and the issues they brought up and their solutions.”
Steven JonesElectrical Engineer, ITW Hi-Cone“First time Summit attendee. Great introduction to a number of topics important to Facility Managers of the Future.”
Alec BartolaiSustainability Program Manager, Sargento Foods, Inc.“I feel that a Summit like this adds to the tools needed to elevate my abilities and my company, to enable a better building/company.”
Reed GibsonFacilities Manager, Pall CorporationWhat sponsors closed, and what buyers said.
Past sponsors on the business that came from an FMA introduction, and past buyers on the vendors they met there.
Set up Wednesday. Two full days of meetings. Home Friday afternoon.
Same schedule in Columbus and Detroit.
- Wednesday afternoonSponsors set up their exhibits. Everyone checks in.
- ThursdayThe full day: plant case studies, booked 1-on-1s, the reception and dinner.
- FridayMorning case studies, more 1-on-1s, closing lunch. On the road by mid-afternoon.
The hour-by-hour plan and the venues
| Time | Wednesday | Thursday | Friday |
|---|---|---|---|
| 7:00 AM | Breakfast at your company table | Breakfast at your company table | |
| 8:00–10:00 AM | Plant case studies | Plant case studies | |
| 10:00 AM | Coffee and shop talk in the exhibit room | Pre-booked 20-minute 1-on-1s at your table | |
| 11:00 AM | Plant case studies | Plant case studies | |
| 12:00 PM | Lunch with your booked 1-on-1 meetings | Closing lunch with your booked 1-on-1 meetings | |
| 1:00 PM | Plant case studies | Plant case studies, then head home | |
| 2:00 PM | Sponsor setup and check-in | Pre-booked 20-minute 1-on-1s at your table | |
| 3:00 PM | Sponsor setup and check-in | Coffee and shop talk in the exhibit room | |
| 3:30 PM | Sponsor setup and check-in | Plant case studies | |
| 5:00–7:00 PM | Sponsor setup and check-in | Reception and dinner, with more 1-on-1s |
The full package's 15 pre-booked 20-minute 1-on-1s run Thursday and Friday: in the meeting blocks above, at lunch, and at the reception. Each is with a plant leader who asked to meet you, at your company table. You get your meeting schedule before you arrive, and the delegate list, with names, titles and companies, 30 days before the summit.


Venue photos via Wikimedia Commons: Hilton Columbus Downtown by Ɱ (CC BY-SA 4.0); Renaissance Center by Crisco 1492 (public domain).
The program: plant leaders come to hear how other plants fixed it.
The program is built from projects plants actually finished, presented by the plant and the company that did the work. Every skilled trades staffing and training category has room for more. If you've solved a problem like these, your story belongs on this program.
-
Skilled trades staffingInvited
How Toledo Steel Supply cut time to fill shop and maintenance roles from 20 days to 8
FactoryFix's manufacturing hiring platform: average time to fill went from 20 days in H1 2024 to 8 days in H1 2025, applicants from 235 to 729, hires from 37 to 48, and annual recruiting spend from $26,000 in 2023 to $13,500 in 2024 (measured; as reported by FactoryFix).
The problem: General job boards gave Toledo Steel Supply, a steel processor hiring year-round across three- and four-shift operations, plenty of applicants but poor fit for roles like crane operator, burn operator and maintenance technician.
Published result: FactoryFix's manufacturing hiring platform: average time to fill went from 20 days in H1 2024 to 8 days in H1 2025, applicants from 235 to 729, hires from 37 to 48, and annual recruiting spend from $26,000 in 2023 to $13,500 in 2024 (measured; as reported by FactoryFix).
Invited: FactoryFix, with Toledo Steel Supply · Read the published case
-
Workforce trainingInvited
How Flexaust in Warsaw, Indiana doubled output on its mandrel line after shop-floor training
Purdue MEP trained 22 employees in over 120 hours over eight months (value stream mapping, 5S, quick changeover, TPM): a 25% reduction in set-up times, mandrel-line production doubled from 100 to 200 feet per shift, and a $120,000 capital commitment for new machining (as reported by Purdue MEP via NIST, December 19, 2025).
The problem: Flexaust, a maker of flexible hose and ducting in Warsaw, Indiana, builds mostly to customer specification and had put little emphasis on eliminating waste in production.
Published result: Purdue MEP trained 22 employees in over 120 hours over eight months (value stream mapping, 5S, quick changeover, TPM): a 25% reduction in set-up times, mandrel-line production doubled from 100 to 200 feet per shift, and a $120,000 capital commitment for new machining (as reported by Purdue MEP via NIST, December 19, 2025).
Invited: Purdue MEP, with Flexaust · Read the published case
-
Outsourced maintenance techniciansInvited
How a snack food plant in the Chicago region cut unplanned downtime 63% with outside maintenance technicians
ATS took over maintenance from its Chicago regional hub: unplanned downtime down 63%, "saving hundreds of thousands of dollars annually", preventive maintenance completion over 85% and 96% maintenance worker retention (period not stated; as reported by Advanced Technology Services).
The problem: A snack food manufacturer's flagship facility had frequent breakdowns because a shortage of skilled maintenance technicians and high staff turnover left routine maintenance behind.
Published result: ATS took over maintenance from its Chicago regional hub: unplanned downtime down 63%, "saving hundreds of thousands of dollars annually", preventive maintenance completion over 85% and 96% maintenance worker retention (period not stated; as reported by Advanced Technology Services).
Invited: Advanced Technology Services (ATS) · Read the published case
See all 7 stories, in 3 categories, and how a session runs
- 1The problemWhat was happening at the plant.
- 2The costEnergy, maintenance, downtime or lost output.
- 3The decisionThe options they weighed, and why this one.
- 4The workWhat changed, how long it took, what went wrong.
- 5The resultsMeasured before and after. Achieved, estimated or identified, said plainly.
- 6The lessonsWhat another plant should check first.
-
Skilled trades staffing
3 stories invited · 1 open slot-
Invited
How Toledo Steel Supply cut time to fill shop and maintenance roles from 20 days to 8
FactoryFix's manufacturing hiring platform: average time to fill went from 20 days in H1 2024 to 8 days in H1 2025, applicants from 235 to 729, hires from 37 to 48, and annual recruiting spend from $26,000 in 2023 to $13,500 in 2024 (measured; as reported by FactoryFix).
The problem: General job boards gave Toledo Steel Supply, a steel processor hiring year-round across three- and four-shift operations, plenty of applicants but poor fit for roles like crane operator, burn operator and maintenance technician.
Published result: FactoryFix's manufacturing hiring platform: average time to fill went from 20 days in H1 2024 to 8 days in H1 2025, applicants from 235 to 729, hires from 37 to 48, and annual recruiting spend from $26,000 in 2023 to $13,500 in 2024 (measured; as reported by FactoryFix).
Invited: FactoryFix, with Toledo Steel Supply · Read the published case
-
Invited
How Petoskey Plastics hires maintenance and controls staff across plants in Michigan and Indiana
FactoryFix, launched in May 2025: 146 recruiting hours saved in 4 months, 675 candidates sourced, 4 hires to date, average cost per hire $1,610 and time to hire under 3 weeks, shown as "50% CPH Savings" (measured; as reported by FactoryFix).
The problem: Petoskey Plastics, a film plastics maker with plants in Michigan, Indiana, Tennessee and Texas, had too many unqualified applicants and too little time to find the right ones for roles such as maintenance technician and electrical and controls team lead.
Published result: FactoryFix, launched in May 2025: 146 recruiting hours saved in 4 months, 675 candidates sourced, 4 hires to date, average cost per hire $1,610 and time to hire under 3 weeks, shown as "50% CPH Savings" (measured; as reported by FactoryFix).
Invited: FactoryFix, with Petoskey Plastics · Read the published case
-
Invited
How an Illinois agricultural tire plant cut turnover and filled 40 open positions
A QPS onsite manager ran recruiting and daily staffing on site: turnover reduced by 36% in just three months, all open positions filled, and additional lines started that increased plant capacity (measured; as reported by QPS Employment Group, April 5, 2024).
The problem: A large agricultural tire manufacturer in Illinois had turnover of over 60% and was 40 positions short of its staffing needs.
Published result: A QPS onsite manager ran recruiting and daily staffing on site: turnover reduced by 36% in just three months, all open positions filled, and additional lines started that increased plant capacity (measured; as reported by QPS Employment Group, April 5, 2024).
Invited: QPS Employment Group · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Outsourced maintenance technicians
1 story invited · 1 open slot-
Invited
How a snack food plant in the Chicago region cut unplanned downtime 63% with outside maintenance technicians
ATS took over maintenance from its Chicago regional hub: unplanned downtime down 63%, "saving hundreds of thousands of dollars annually", preventive maintenance completion over 85% and 96% maintenance worker retention (period not stated; as reported by Advanced Technology Services).
The problem: A snack food manufacturer's flagship facility had frequent breakdowns because a shortage of skilled maintenance technicians and high staff turnover left routine maintenance behind.
Published result: ATS took over maintenance from its Chicago regional hub: unplanned downtime down 63%, "saving hundreds of thousands of dollars annually", preventive maintenance completion over 85% and 96% maintenance worker retention (period not stated; as reported by Advanced Technology Services).
Invited: Advanced Technology Services (ATS) · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
-
Workforce training
3 stories invited · 1 open slot-
Invited
How Flexaust in Warsaw, Indiana doubled output on its mandrel line after shop-floor training
Purdue MEP trained 22 employees in over 120 hours over eight months (value stream mapping, 5S, quick changeover, TPM): a 25% reduction in set-up times, mandrel-line production doubled from 100 to 200 feet per shift, and a $120,000 capital commitment for new machining (as reported by Purdue MEP via NIST, December 19, 2025).
The problem: Flexaust, a maker of flexible hose and ducting in Warsaw, Indiana, builds mostly to customer specification and had put little emphasis on eliminating waste in production.
Published result: Purdue MEP trained 22 employees in over 120 hours over eight months (value stream mapping, 5S, quick changeover, TPM): a 25% reduction in set-up times, mandrel-line production doubled from 100 to 200 feet per shift, and a $120,000 capital commitment for new machining (as reported by Purdue MEP via NIST, December 19, 2025).
Invited: Purdue MEP, with Flexaust · Read the published case
-
Invited
How Thermo Fisher Scientific in Marietta, Ohio kept new electrical workers qualified to NFPA 70E
OSU South Centers MEP and Rozel Consultants ran an NFPA 70E electrical safety field audit of qualified electrical workers with feedback to each worker: 30 increased/retained jobs, $25,000 in new investment and $15,000 in cost savings (as reported by the OSU South Centers MEP via NIST).
The problem: Staffing issues meant Thermo Fisher's Marietta, Ohio biosafety cabinet plant (about 458 people) had to train new and transitional employees outside its regular annual training.
Published result: OSU South Centers MEP and Rozel Consultants ran an NFPA 70E electrical safety field audit of qualified electrical workers with feedback to each worker: 30 increased/retained jobs, $25,000 in new investment and $15,000 in cost savings (as reported by the OSU South Centers MEP via NIST).
Invited: OSU South Centers MEP and Rozel Consultants, with Thermo Fisher Scientific · Read the published case
-
Invited
How MSP Manufacturing in Bloomington, Indiana sped up inspection with CNC and CMM training
Purdue MEP trained 8 employees on Mastercam CNC and a Faro Arm CMM and 2 as AS9100D internal auditors: 25% time savings in quality inspection, "$50,000 in estimated improved productivity annually" and 5-10% increased sales (estimated; as reported by Purdue MEP via NIST).
The problem: After business grew 30% in a year, MSP Manufacturing, a precision machining shop for aerospace and defense, needed more CNC skill to make parts faster and cross-trained inspectors to keep up.
Published result: Purdue MEP trained 8 employees on Mastercam CNC and a Faro Arm CMM and 2 as AS9100D internal auditors: 25% time savings in quality inspection, "$50,000 in estimated improved productivity annually" and 5-10% increased sales (estimated; as reported by Purdue MEP via NIST).
Invited: Purdue MEP, with MSP Manufacturing · Read the published case
- Open slot
Your customer's story goes here.
Solved a plant problem in this category? Propose it for the program.
-
"Invited" means invited: none of these companies has confirmed. Results are as published by the supplier; we ask every presenter for dates, baseline costs and verified results before the program is final.





Real FMA Summit rooms. No stock photography.
Get in front of the decision makers, not the crowd.
Full package
- 15 guaranteed pre-scheduled meetings
- A 20-minute case-study session
- A fully furnished exhibit
- Your corporate dining table
- Three people at full access
Add meetings up to 40 at $1,500 each.
- Any booked meeting that doesn’t happen is added to your next summit, written into your sponsor agreement.
- Each summit is capped at 20 sponsors, each solving a different problem for the people in the room.
Want the category to yourself? Each summit is capped at 20 sponsors. To talk about your category, .
- Plant leaders ask to meet you. We seat the ones who asked at your table.
- Your booked meeting schedule arrives before the summit.
- Any booked meeting that doesn't happen is added to your next summit: miss 3, and you get 15 plus 3. It's written into your sponsor agreement.
- You get the delegate list 30 days before the summit: names, titles and companies.
- Three people are included with full access. Extra passes are $2,900 each.
Or pick only what you wantMeetings from $15,000, talk $15,000, exhibit $15,000, dining table $10,000
One category, one summit. Prices in USD. Whatever you pick includes three people with full access. Meetings are booked on an opt-in basis before the summit; any booked meeting that doesn't happen is added to your next summit.
No vendor walks the show. Solution providers attend only as sponsors. A vendor that has not sponsored cannot register, attend or work the room, so the plant leaders you meet are not being chased by your competitors in the hallway.
The ten questions every sponsor asks.
Past sponsors answer all ten in one 5-minute film. Pick a question and the film jumps to its answer.
Now ask your own questions.
Answered on camera by past FMA sponsors. Recorded at past FMA summits.
Who's behind it.


Started FMA in Montreal in 2007 and has run every summit himself: 35 of them, 17,000+ meetings. Capped at 20 sponsors per summit, meetings booked before anyone arrives, and no vendor walks the show.
Read the full story





30 printed programs, with every sponsor and speaker as printed.
Open any programStaffing, outsourced maintenance and training. The summit is capped at 20 sponsors.
Twenty minutes with Joe Piazza: who is coming to your summit, where your company fits among its 20 sponsors, and what the agreement says. The sponsor brief has the delegate profile, the full agenda and the itemized pricing.
35 summits since 2007. Joe Piazza, who founded FMA, runs every summit himself. The videos on this page are from past summits.